How To Fix KK319 - Planning currency does not exist


KK319 - Overview

  • Message type: E = Error

  • Message class: KK -

  • Message number: 319

  • Message text: Planning currency does not exist

  • Show details Hide details
  • What causes this issue?

    The planning currency in which a unit cost estimate is created does not
    exist. This means, for example, that you are trying to plan in
    transaction currency, but the key for this currency is missing.
    This can occur if the switch allowing planning in all currencies was
    changed from 'Not allowed' to 'Allowed' in the control data for the CO
    area settings.
    If planning was already carried out without currencies, that is, only
    in CO area currency, this can no longer be changed as unit costing does
    not know the missing currencies.

    System Response

    You can no longer change the unit cost estimate.

    How to fix this error?

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.


    Error message extract from SAP system. Copyright SAP SE.


KK319 - Details

  • The SAP error message KK319: Planning currency does not exist typically occurs in the context of controlling (CO) and profitability analysis (CO-PA) when you are trying to perform planning activities, such as creating or updating planning data, and the system cannot find the specified planning currency for the relevant controlling area or the specific planning version.
    Causes:
    
    Missing Planning Currency Configuration: The planning currency may not be defined for the controlling area or the specific planning version you are using.
    Incorrect Settings in Master Data: The master data for the cost center, internal order, or profitability segment may not have the correct currency settings.
    Inconsistent Currency Settings: There may be inconsistencies between the company code currency, controlling area currency, and planning currency.
    Version Not Defined: The planning version you are trying to use may not be defined correctly or may not have been activated.
    
    Solutions:
    
    
    Check Planning Currency Configuration:
    
    Go to the configuration settings for your controlling area

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


KK319 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker