Message type: E = Error
Message class: KK -
Message number: 029
Message text: No cost estimate exists for reference project & for &
The project you entered as a reference has no cost estimate for the
year &v2&.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Check your entries. Enter a project for which a cost estimate for the
year &v2& was created.
Error message extract from SAP system. Copyright SAP SE.
KK029
- No cost estimate exists for reference project & for & ?The SAP error message KK029 ("No cost estimate exists for reference project & for &") typically occurs in the context of project controlling (CO) when you are trying to perform an operation related to a project that requires a cost estimate, but no cost estimate has been created for the specified project.
Cause:
Missing Cost Estimate: The primary cause of this error is that there is no cost estimate available for the reference project you are trying to access. This could happen if:
- The cost estimate has not been created yet.
- The cost estimate has been deleted or not saved properly.
- The project is not set up correctly in the system.
Incorrect Project Reference: The project reference you are using may be incorrect or not linked to a valid cost estimate.
Authorization Issues: Sometimes, the user may not have the necessary authorizations to view or create cost estimates for the project.
Solution:
Create a Cost Estimate:
- Navigate to the cost estimating transaction (e.g., CK11N for creating a cost estimate).
- Ensure that you create a cost estimate for the specific project in question.
Check Project Settings:
- Verify that the project is correctly set up in the system and that it is linked to the appropriate cost elements and cost centers.
Review Existing Cost Estimates:
- Use transaction CK13N to check if any cost estimates exist for the project. If none exist, you will need to create one.
Authorization Check:
- Ensure that you have the necessary authorizations to create or view cost estimates. If not, contact your SAP security administrator to obtain the required permissions.
Consult Documentation:
- Review the project documentation and ensure that all necessary steps for cost estimation have been followed.
Related Information:
Transaction Codes:
SAP Notes: Check for any relevant SAP Notes that might address specific issues related to cost estimates and project controlling.
Training and Documentation: Consider reviewing SAP training materials or documentation related to Project System (PS) and Controlling (CO) modules for a better understanding of cost estimates.
If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in the Project System module.
Get instant SAP help. Start your 7-day free trial now.
KK028
No cost estimate exists for reference order & for &
What causes this issue? The order you entered as a reference has no cost estimate for the year &v2&.System Response The system issues an err...
KK027
Reference project & is not assigned to controlling area &
What causes this issue? The project you entered as a reference is not assigned to controlling area &v2&. This means that no data could be tr...
KK030
No unit cost estimate exists for reference &
What causes this issue? No costing item has been created for the base planning object that you entered as a reference. This means that no fields cou...
KK031
Plant & does not exist
What causes this issue? You are trying to assign an assembly to a plant which does not exist in the system.System Response The system issues an erro...
Click on this link to search all SAP messages.