How To Fix KK029 - No cost estimate exists for reference project & for &


SAP Error Message - Details

  • Message type: E = Error

  • Message class: KK -

  • Message number: 029

  • Message text: No cost estimate exists for reference project & for &

  • Show details Hide details
  • What causes this issue?

    The project you entered as a reference has no cost estimate for the
    year &v2&.

    System Response

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.

    How to fix this error?

    Check your entries. Enter a project for which a cost estimate for the
    year &v2& was created.

    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message KK029 - No cost estimate exists for reference project & for & ?

    The SAP error message KK029 ("No cost estimate exists for reference project & for &") typically occurs in the context of project controlling (CO) when you are trying to perform an operation related to a project that requires a cost estimate, but no cost estimate has been created for the specified project.

    Cause:

    1. Missing Cost Estimate: The primary cause of this error is that there is no cost estimate available for the reference project you are trying to access. This could happen if:

      • The cost estimate has not been created yet.
      • The cost estimate has been deleted or not saved properly.
      • The project is not set up correctly in the system.
    2. Incorrect Project Reference: The project reference you are using may be incorrect or not linked to a valid cost estimate.

    3. Authorization Issues: Sometimes, the user may not have the necessary authorizations to view or create cost estimates for the project.

    Solution:

    1. Create a Cost Estimate:

      • Navigate to the cost estimating transaction (e.g., CK11N for creating a cost estimate).
      • Ensure that you create a cost estimate for the specific project in question.
    2. Check Project Settings:

      • Verify that the project is correctly set up in the system and that it is linked to the appropriate cost elements and cost centers.
    3. Review Existing Cost Estimates:

      • Use transaction CK13N to check if any cost estimates exist for the project. If none exist, you will need to create one.
    4. Authorization Check:

      • Ensure that you have the necessary authorizations to create or view cost estimates. If not, contact your SAP security administrator to obtain the required permissions.
    5. Consult Documentation:

      • Review the project documentation and ensure that all necessary steps for cost estimation have been followed.

    Related Information:

    • Transaction Codes:

      • CK11N: Create Cost Estimate
      • CK13N: Display Cost Estimate
      • CJ20N: Project Builder (to check project details)
    • SAP Notes: Check for any relevant SAP Notes that might address specific issues related to cost estimates and project controlling.

    • Training and Documentation: Consider reviewing SAP training materials or documentation related to Project System (PS) and Controlling (CO) modules for a better understanding of cost estimates.

    If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in the Project System module.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant