Message type: E = Error
Message class: KJ - Cost Object Controlling for Make-to-Order Production
Message number: 469
Message text: Version with nonoperational valuation can only reference version 000
A <DS:GLOS.results_analysis_version>results analysis version</> of WIP
calculation and results analysis with a nonoperational
<DS:GLOS.valuation_view>valuation view</> can only reference version
<ZH>000</>.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Change the reference or delete this version.
Error message extract from SAP system. Copyright SAP SE.
KJ469
- Version with nonoperational valuation can only reference version 000 ?The SAP error message KJ469 indicates that you are trying to reference a version of a plan or actual data that is not operational for the valuation you are working with. Specifically, it states that only version 000 (the standard version) can be referenced in this context.
Cause: Non-Operational Version: The version you are trying to use is not set up as an operational version in the system. In SAP, versions are used to manage different sets of data, and only certain versions are allowed for specific operations.
Configuration Issues: The configuration settings for the version you are trying to use may not allow it to be referenced in the context of the valuation you are performing. Data Entry Error: There may be a mistake in the data entry where the wrong version is being selected.
Solution: Use Version 000: If your task requires referencing a version for operational purposes, switch to using version 000, which
Get instant SAP help. Sign up for our Free Essentials Plan.
KJ468
Transaction data exists for WIP calculation or results analysis
What causes this issue? Transaction data already exists for WIP calculation or results analysis in your client. Find out whether there is any transac...
KJ467
Nonoperational valuation views not active
What causes this issue? The nonoperational <DS:GLOS.valuation_view>valuation views</> are not active.System Response The system issues a...
KJ470
Use (plan value) overrun "&" only with valuation basis O or 0-9
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
KJ471
WIP at target costs: No valuation difference vs. operational valuation
What causes this issue? There is currently <DS:GLOS.work_in_process>work in process</> at actual costs only in the operational <DS:GLO...
Click on this link to search all SAP messages.