Do you have any question about this error?
Message type: E = Error
Message class: KEO - Enterprise Organization
Message number: 100
Message text: Still under construction ... not yet available...
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
KEO100
- Still under construction ... not yet available... ?The SAP error message KEO100, which states "Still under construction ... not yet available," typically occurs in the context of the SAP Controlling (CO) module, particularly when dealing with cost centers, internal orders, or other controlling objects that are not fully set up or activated.
Cause:
- Incomplete Configuration: The object (e.g., cost center, internal order) you are trying to access or use is still in the process of being created or configured. This means that it has not been fully activated in the system.
- Missing Master Data: Required master data for the object may not be available or fully maintained.
- Authorization Issues: The user may not have the necessary authorizations to access the object, leading to the perception that it is "under construction."
- System Status: The object may be in a status that does not allow it to be used (e.g., it is marked as "not active" or "not released").
Solution:
- Check Object Status: Verify the status of the object in question. Ensure that it is fully created and activated. You can do this by navigating to the relevant transaction (e.g., transaction code
KS01
for cost centers) and checking the status.- Complete Configuration: If the object is still under construction, complete the necessary configuration steps. This may involve filling in missing fields or activating the object.
- Review Master Data: Ensure that all required master data is maintained. For example, if it’s a cost center, check that all relevant details (like cost center category, controlling area, etc.) are filled out.
- Check Authorizations: Ensure that the user has the necessary authorizations to access the object. This may involve checking roles and permissions in the user profile.
- Consult Documentation: Refer to SAP documentation or help files for specific guidance on the object you are working with, as there may be additional steps required for certain configurations.
Related Information:
KS01
(Create Cost Center), KO01
(Create Internal Order), and KSB1
(Display Actual Line Items).By following these steps, you should be able to resolve the KEO100 error and ensure that the controlling objects are properly configured and available for use.
Get instant SAP help. Start your 7-day free trial now.
KEO096
Messages were placed on the spool list
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
KEO095
Activate inactive &1 in controlling area &2 first
What causes this issue? No inactive &V1& can exist in controlling area &V2& if you want to create a &V3& (standard hierarchy,...
KEO101
Cost center &2 is not in timeframe &3
What causes this issue? You created cost center &V2& in controlling area &V1& during time interval &V4&, but forecast period ...
KEO102
Profit center &2 is not in timeframe &3
What causes this issue? Profit center &V2& is created in controlling area &V1& within time interval &V4&. However, forecast p...
Click on this link to search all SAP messages.