How To Fix KEIX025 - Proj. or proj. branch does not contain any/non-calculable plan. elements


KEIX025 - Overview

  • Message type: E = Error

  • Message class: KEIX - ECP in Several Plan Versions

  • Message number: 025

  • Message text: Proj. or proj. branch does not contain any/non-calculable plan. elements

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message KEIX025 - Proj. or proj. branch does not contain any/non-calculable plan. elements ?
    The SAP error message KEIX025 indicates that a project or project branch does not contain any plan elements or contains non-calculable plan elements. This error typically occurs in the context of controlling and project management within SAP, particularly when working with internal orders, projects, or cost centers.
    
    Cause: Missing Plan Elements: The project or project branch may not have any planned costs or revenues associated with it. This can happen if the planning has not been done or if the planning data has been deleted. Non-Calculable Plan Elements: The project may contain plan elements that are not suitable for calculations, such as certain types of costs that cannot be allocated or are not relevant for the specific project. Incorrect Configuration: There may be configuration issues in the project structure or in the controlling area that prevent the system from recognizing the plan elements. Data Inconsistencies: There could be inconsistencies in the data, such as missing

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker