Do you have any question about this error?
Message type: E = Error
Message class: KEIX - ECP in Several Plan Versions
Message number: 025
Message text: Proj. or proj. branch does not contain any/non-calculable plan. elements
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
KEIX025
- Proj. or proj. branch does not contain any/non-calculable plan. elements ?The SAP error message KEIX025 indicates that a project or project branch does not contain any plan elements or contains non-calculable plan elements. This error typically occurs in the context of controlling and project management within SAP, particularly when working with internal orders, projects, or cost centers.
Cause:
- Missing Plan Elements: The project or project branch may not have any planned costs or revenues associated with it. This can happen if the planning has not been done or if the planning data has been deleted.
- Non-Calculable Plan Elements: The project may contain plan elements that are not suitable for calculations, such as certain types of costs that cannot be allocated or are not relevant for the specific project.
- Incorrect Configuration: There may be configuration issues in the project structure or in the controlling area that prevent the system from recognizing the plan elements.
- Data Inconsistencies: There could be inconsistencies in the data, such as missing or incorrect assignments of cost elements or cost centers.
Solution:
- Check Planning Data: Verify that the project or project branch has valid planning data. You can do this by navigating to the project in the SAP system and checking the planning status.
- Create or Update Plan Elements: If there are no plan elements, you will need to create them. This can be done through the planning transaction (e.g., CJ20N for project management) where you can enter the necessary planned costs and revenues.
- Review Non-Calculable Elements: If there are non-calculable elements, review the project structure and ensure that all elements are relevant for calculations. You may need to adjust the configuration or remove non-calculable elements.
- Check Configuration Settings: Ensure that the project and controlling area settings are correctly configured. This includes checking the settings for cost elements, cost centers, and internal orders.
- Run Consistency Checks: Use SAP tools to run consistency checks on the project data to identify any discrepancies or issues that need to be resolved.
Related Information:
By following these steps, you should be able to identify the cause of the KEIX025 error and implement the necessary solutions to resolve it.
Get instant SAP help. Start your 7-day free trial now.
KEIX024
Version &1 does not exist or is not allowed for ECP
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
KEIX023
Source version and target version must be different
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
KEIX026
&1, version &2: unit costing already exists
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
KEIX027
ECP is already active in multiple plan versions
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.