Do you have any question about this error?
Message type: E = Error
Message class: KE -
Message number: 336
Message text: Valuation is not defined
You tried to execute valuation in CO-PA. To do so, you must have at
least one entry in Table TKEVA02 (table for the definition of a
valuation strategy).
This warning is displayed because the valuation strategy &V2& is not
defined for operating concern &V1&.
If you want to execute valuation, you first have to define and assign
a valuation strategy. You can do this in CO-PA Customizing.
Error message extract from SAP system. Copyright SAP SE.
KE336
- Valuation is not defined ?The SAP error message KE336 "Valuation is not defined" typically occurs in the context of controlling (CO) when you are trying to execute a transaction that requires a valuation method for a particular cost object, such as a cost center, internal order, or project. This error indicates that the system cannot find a valuation method for the specified object or that the valuation is not properly configured.
Causes:
- Missing Valuation Method: The valuation method for the cost object is not defined in the system.
- Incorrect Configuration: The configuration settings for the controlling area or the specific cost object may not be set up correctly.
- Master Data Issues: The master data for the cost object may be incomplete or incorrectly maintained.
- Transaction Type: The transaction you are trying to execute may not be compatible with the valuation method defined.
Solutions:
Define Valuation Method:
- Go to the configuration settings in SAP (Transaction SPRO).
- Navigate to Controlling > Cost Element Accounting > Master Data > Cost Elements > Define Valuation Methods.
- Ensure that the appropriate valuation method is defined for the relevant cost object.
Check Configuration:
- Verify the configuration for the controlling area and ensure that all necessary settings are in place.
- Check if the valuation method is assigned to the relevant cost object.
Review Master Data:
- Check the master data for the cost center, internal order, or project to ensure that all required fields are filled out correctly.
- Make sure that the cost object is active and properly set up.
Transaction Compatibility:
- Ensure that the transaction you are trying to execute is compatible with the valuation method defined.
- If necessary, consult the documentation or help resources for the specific transaction to understand its requirements.
Consult SAP Notes:
- Check the SAP Support Portal for any relevant SAP Notes that may address this specific error message or provide additional guidance.
Related Information:
OKB9
(for defining valuation methods) or KS01
(for creating cost centers) to access the relevant configuration areas.By following these steps, you should be able to resolve the KE336 error and ensure that the valuation methods are correctly defined and configured in your SAP system.
Get instant SAP help. Start your 7-day free trial now.
KE335
You are not authorized to create a derivation structure
What causes this issue? You are not authorized to create a derivation structure.System Response The system issues an error message and will not allo...
KE334
Do not use assignment group &
What causes this issue? The system issues an error message and will not allow you to continue with this transaction until the error is resolved. Syst...
KE337
Characteristic & must be renamed! Change valuation accordingly!
What causes this issue? Characteristic &V1& had to be renamed due to a naming conflict in the valuation tables. The new name is &V2&....
KE338
Profitability Analysis is not active!
What causes this issue? You tried to call up the assignment screen for Profitability Analysis. However, Profitability Analysis is not active. The sys...
Click on this link to search all SAP messages.