Message type: E = Error
Message class: KE/NC -
Message number: 128
Message text: You cannot execute due to the status of the realignment run
Realignment run "&V1&" can no longer be executed due to its status.
The following status changes are supported:
A new realignment run can be <ZH>scheduled</> using the "Schedule"
function.
If the job control executes a scheduled realignment run, its status
becomes <ZH>running</>.
A realignment run that is "running" can be completed as <ZH>successful
</>, or it can be terminated abnormally.
If it is terminated abnormally, the status becomes <ZH>terminated</>.
Once a run is either "successful" or "terminated", you can restore the
data to its state before that run. In this case, the realignment run
takes on the status <ZH>restored</> (or terminated, if the restore
cannot be completed successfully).
A restored run retains this status. If you want to execute the
realignment again, you need to copy the realignment run.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
KE/NC128
- You cannot execute due to the status of the realignment run ?The SAP error message KE/NC128 indicates that a realignment run cannot be executed due to the current status of that run. This typically occurs in the context of Profitability Analysis (CO-PA) when there are issues with the realignment process.
Cause: The error can be caused by several factors, including: Incomplete Realignment Run: The previous realignment run may not have been completed successfully, leaving the system in a state where it cannot process new requests. Locked Status: The realignment run may be locked due to ongoing processes or transactions that are preventing further actions.
Configuration Issues: There may be configuration settings in the system that are preventing the execution of the realignment run. Authorization Issues: The user may not have the necessary authorizations to execute the realignment run.
Solution: To resolve the KE/NC128 error, you can take the following steps: Check Realignment Status: Go to the transaction code for realignment (e.g., KE4S) and check the status of the realignment run. Ensure
Get instant SAP help. Sign up for our Free Essentials Plan.
KE/NC127
The realignment run does not contain any realignment requests
What causes this issue? You want to execute a realignment run. However, realignment run '&V1&' does not contain any dependent reali...
KE/NC126
Save your data before executing
What causes this issue? You need to save the settings before you can execute the realignment run. You have made changes to the data that have not yet...
KE/NC129
Dependent characteristics are also removed from the selection
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
KE/NC130
Higher-level characteristics are also added to the selection
What causes this issue? One or more of the characteristics included in your selection are dependent on higher-level characteristics.System Response ...
Click on this link to search all SAP messages.