Do you have any question about this error?
Message type: E = Error
Message class: KBP - Log Messages EC-BP
Message number: 002
Message text: Parameters of the current planning run:
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
KBP002
- Parameters of the current planning run: ?The SAP error message KBP002, which states "Parameters of the current planning run," typically occurs in the context of SAP's Integrated Business Planning (IBP) or Advanced Planning and Optimization (APO) modules. This error can arise due to various reasons related to the configuration or execution of planning runs.
Causes:
- Incorrect Planning Parameters: The parameters set for the planning run may be incorrect or incomplete. This includes settings for the planning version, planning area, or other relevant parameters.
- Missing Master Data: Required master data (like product, location, or resource) may be missing or not properly maintained in the system.
- Data Locking Issues: There may be data locks in place that prevent the planning run from executing properly.
- Authorization Issues: The user executing the planning run may not have the necessary authorizations to perform the action.
- Configuration Errors: There may be issues with the configuration of the planning run itself, such as incorrect settings in the planning profile or planning sequence.
Solutions:
- Check Planning Parameters: Review the parameters set for the planning run. Ensure that all required fields are filled out correctly and that the values are valid.
- Validate Master Data: Ensure that all necessary master data is available and correctly maintained. This includes checking for any missing or incorrect entries in the relevant master data tables.
- Release Data Locks: If there are data locks, identify and release them. This may involve checking for other users or processes that are currently accessing the data.
- Review Authorizations: Ensure that the user has the necessary authorizations to execute the planning run. This may involve checking user roles and permissions in the SAP system.
- Check Configuration: Review the configuration settings for the planning run. Ensure that the planning profile and sequence are correctly set up and that there are no inconsistencies.
Related Information:
/SAPAPO/SDP94
for planning runs in APO or /IBP/PLANNING
for IBP.If the problem persists after trying the above solutions, it may be beneficial to consult with your SAP support team or reach out to SAP support for further assistance.
Get instant SAP help. Start your 7-day free trial now.
KBP001
Planning run started: Variant: &1 Date: &2 Time: &3
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
KBGEN012
No profile selected for material &1. Select one profile for each material
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
KBP003
Target aspect: &1 Version: &2 Period from: &3 to: &4
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
KBP004
Reference aspect: &1 Version: &2 Period from: &3 to: &4
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.