Message type: E = Error
Message class: KBAS_XI_PROXY - Message Class for KBAS_XI_PROXY
Message number: 101
Message text: You cannot create cost element &1 without controlling area data
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
KBAS_XI_PROXY101
- You cannot create cost element &1 without controlling area data ?The SAP error message KBAS_XI_PROXY101 indicates that you are trying to create a cost element without the necessary controlling area data. This error typically occurs in the context of the Controlling (CO) module in SAP, where cost elements are used to categorize costs for internal reporting and analysis.
Cause: The error arises when: You attempt to create a cost element without specifying a controlling area. The controlling area is not assigned or is missing in the configuration. The cost element type you are trying to create requires a controlling area, but the system cannot find the relevant data.
Solution: To resolve this error, you can follow these steps: Check Controlling Area Assignment: Ensure that the controlling area is correctly assigned to the company code you are working with. You can check this in the configuration settings under: SPRO ? Enterprise Structure ? Assignment ? Controlling ? Assign Company Code to Controlling Area. Create or Assign Controlling Area: If the controlling area does
Get instant SAP help. Sign up for our Free Essentials Plan.
KBAS_XI_PROXY100
***************Messages for Cost Component ****************************
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
KBAS_XI_PROXY079
&1 is either not contained under &2 in message, or local hierarchy
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
KBAS_XI_PROXY102
No cost element category could be determined for code value &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
KBAS_XI_PROXY103
You cannot create cost element &1 without texts
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.