Do you have any question about this error?
Message type: E = Error
Message class: K9 - CO Planning Processor
Message number: 226
Message text: Check selection for block insertion
The clipboard contains blocks which lie completely in a row. The insert
position was implicitly selected by means of the cursor. However, the
cursor is either placed in a lead column or not placed in the area of
the table control.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
To insert the blocks, select the insertion position either explicitly
with a data cell or implicitly by placing the cursor to the required
insertion position, which has to be outside the lead columns.
Error message extract from SAP system. Copyright SAP SE.
K9226
- Check selection for block insertion ?The SAP error message K9226, "Check selection for block insertion," typically occurs in the context of the Controlling (CO) module, particularly when dealing with cost center accounting or internal orders. This error indicates that there is an issue with the selection criteria used for inserting a block of data, such as cost elements or cost centers.
Cause:
The error can be caused by several factors, including:
Incorrect Selection Criteria: The selection criteria you have specified for the block insertion may not match any existing records in the system. This could be due to incorrect filters or parameters.
Data Integrity Issues: There may be inconsistencies or missing data in the master data that you are trying to work with, such as cost centers or cost elements.
Authorization Issues: The user may not have the necessary authorizations to perform the block insertion for the selected data.
Technical Issues: There could be a technical issue with the SAP system, such as a bug or a configuration problem.
Solution:
To resolve the K9226 error, you can take the following steps:
Review Selection Criteria: Double-check the selection criteria you are using for the block insertion. Ensure that they are correct and that they correspond to existing records in the system.
Check Master Data: Verify that the master data (cost centers, cost elements, etc.) is complete and accurate. Look for any missing or inconsistent entries.
Authorization Check: Ensure that the user has the necessary authorizations to perform the operation. You may need to consult with your SAP security team to verify this.
Consult SAP Notes: Check the SAP Support Portal for any relevant SAP Notes that may address this specific error. There may be patches or updates available that resolve known issues.
Technical Support: If the issue persists, consider reaching out to your SAP support team or consulting with an SAP expert to investigate any potential technical issues.
Related Information:
By following these steps, you should be able to identify the cause of the K9226 error and implement a suitable solution.
Get instant SAP help. Start your 7-day free trial now.
K9225
Check selection for block insertion
What causes this issue? The clipboard contains blocks which lie completely in a column. The insertion point was selected implicitly by means of the c...
K9224
Check selection for column insertion
What causes this issue? An entire column is contained in the clipboard, the insertion point was selected by means of the cursor position. In this cas...
K9227
Check selection for row insertion
What causes this issue? The clipboard contains an entire row. The insert position was determined implicitly by means of the cursor position. The curs...
K9228
Insertion point for block is not unique
What causes this issue? The clipboard contains blocks which lie completely in a column. A column was explicitly selected as insertion position. The i...
Click on this link to search all SAP messages.