Do you have any question about this error?
Message type: E = Error
Message class: K3 - Material Cost Estimate
Message number: 061
Message text: Lot size of initial screen ignored
For a costing variant with a reference variant, the lot size of the
referenced cost estimate is used.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
The lot size specified on the initial screen is ignored.
Error message extract from SAP system. Copyright SAP SE.
K3061
- Lot size of initial screen ignored ?The SAP error message K3061, which states "Lot size of initial screen ignored," typically occurs in the context of the SAP Controlling (CO) module, particularly when dealing with cost center planning or other planning-related transactions. This message indicates that the lot size specified in the initial screen of a planning transaction is not being considered for the current operation.
Cause:
- Lot Size Configuration: The lot size defined in the initial screen may not be applicable for the specific planning scenario or may not be set up correctly in the system.
- Planning Version: The planning version being used may not support the specified lot size.
- Data Inconsistencies: There may be inconsistencies in the master data or planning data that lead to the lot size being ignored.
- Transaction Type: The transaction type being used may not require or recognize the lot size.
Solution:
- Check Lot Size Settings: Review the lot size settings in the configuration for the planning area or the specific transaction you are using. Ensure that the lot size is defined correctly and is applicable to the planning scenario.
- Review Planning Version: Ensure that the planning version you are using supports the lot size you have specified. You may need to switch to a different version or adjust the settings of the current version.
- Validate Master Data: Check the master data related to the cost centers, internal orders, or other relevant objects to ensure that there are no inconsistencies that could lead to this error.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidance on the planning transaction you are using, as there may be additional parameters or settings that need to be configured.
- Testing: If possible, try running the transaction with different lot sizes or without specifying a lot size to see if the error persists.
Related Information:
If the issue persists after trying the above solutions, it may be beneficial to consult with your SAP support team or a consultant who specializes in SAP Controlling for further assistance.
Get instant SAP help. Start your 7-day free trial now.
K3060
Cost comp structure & not maintained in Customizing table (tckh4)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
K3055
Internal error: invalid processing mode
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
K3062
Partner version & of additive costs is no longer current
What causes this issue? You are executing a cost estimate with quantity structure. In the <DS:GLOS.3526B726AFAB52B9E10000009B38F974>costing var...
K3063
Partner number for & could not be determined correctly
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.