Do you have any question about this error?
Message type: E = Error
Message class: K3 - Material Cost Estimate
Message number: 000
Message text: ======== Product Costing / Non-SAP PPC (Planning) =======================
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
K3000
- ======== Product Costing / Non-SAP PPC (Planning) ======================= ?The SAP error message K3000 typically indicates an issue related to product costing in the context of non-SAP production planning (PPC). This error can arise due to various reasons, often related to configuration, master data, or integration issues between SAP and non-SAP systems.
Cause:
- Missing Master Data: The error may occur if the necessary master data (like material master, cost center, or production version) is not maintained or is incomplete.
- Configuration Issues: Incorrect configuration in the product costing settings or in the integration between SAP and the non-SAP system can lead to this error.
- Data Transfer Issues: If there are problems in the data transfer from the non-SAP system to SAP, it can result in this error.
- Costing Variant Issues: The costing variant used may not be correctly set up or may not match the requirements for the product costing process.
- Authorization Issues: Lack of proper authorizations for the user trying to execute the costing process can also trigger this error.
Solution:
- Check Master Data: Ensure that all relevant master data is correctly maintained. This includes checking the material master, cost centers, and production versions.
- Review Configuration: Verify the configuration settings for product costing in SAP. Ensure that the costing variant and other related settings are correctly defined.
- Data Transfer Validation: If you are using a non-SAP system for production planning, check the data transfer process to ensure that all necessary data is being sent to SAP correctly.
- Costing Variant Review: Make sure that the costing variant being used is appropriate for the product and that it is set up correctly in the system.
- Authorization Check: Confirm that the user has the necessary authorizations to perform the costing process. If not, work with your SAP security team to resolve any authorization issues.
Related Information:
If the problem persists after checking these areas, it may be beneficial to involve your SAP support team or a consultant with expertise in product costing and integration issues.
Get instant SAP help. Start your 7-day free trial now.
K2999
***Reserved for validation messages
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
K2003
The document date is not the current date
What causes this issue? You have tried to post a document but the posting date is not the current date.System Response NoneHow to fix this error? N...
K3001
Table(s) & & contain(s) error, or not found
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
K3002
Costing variant does not exist (please check your entry)
What causes this issue? The costing variant you entered does not exist in the system or is not valid for the reference object (material) to be costed...
Click on this link to search all SAP messages.