Do you have any question about this error?
Message type: E = Error
Message class: K- -
Message number: 375
Message text: Enter an end date that is larger than or equal to the start date
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
K-375
- Enter an end date that is larger than or equal to the start date ?The SAP error message K-375, which states "Enter an end date that is larger than or equal to the start date," typically occurs in the context of date entry in various SAP transactions, particularly in controlling (CO) or project management (PS) modules. This error indicates that the end date you have entered is earlier than the start date, which is logically incorrect.
Cause:
- Incorrect Date Entry: The most common cause is simply entering the end date incorrectly, such as typing a date that is earlier than the start date.
- Date Format Issues: Sometimes, the date format may not be recognized correctly, leading to confusion in the system.
- System Settings: In some cases, system settings or user profiles may affect how dates are interpreted.
Solution:
- Check Dates: Review the start and end dates you have entered. Ensure that the end date is indeed later than or equal to the start date.
- Correct Format: Make sure that the dates are entered in the correct format as per your system's configuration (e.g., DD/MM/YYYY or MM/DD/YYYY).
- Re-enter Dates: If you suspect a typo, clear the fields and re-enter the dates carefully.
- Consult Documentation: If you are unsure about the date requirements for a specific transaction, refer to the SAP documentation or help files related to that transaction.
- User Training: If this error occurs frequently, consider providing additional training for users on how to enter dates correctly in SAP.
Related Information:
If the problem persists after checking the above points, it may be beneficial to consult with your SAP support team or a technical consultant for further assistance.
Get instant SAP help. Start your 7-day free trial now.
K-374
Error in attributable amount determination for drawing &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
K-373
Error when converting currency &1 to &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
K-376
You are not authorized to create facilities
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
K-377
You are not authorized to change facilities
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.