Message type: E = Error
Message class: K- -
Message number: 324
Message text: Calculation base is not suitable for determination procedure &1 / &2
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
K-324
- Calculation base is not suitable for determination procedure &1 / &2 ?The SAP error message K-324, which states "Calculation base is not suitable for determination procedure &1 / &2," typically occurs in the context of cost accounting, particularly when dealing with cost element accounting or internal orders. This error indicates that the calculation base defined for a particular cost element or internal order does not match the requirements of the determination procedure being used.
Causes:
- Incompatible Calculation Base: The calculation base defined for the cost element or internal order does not align with the expected calculation base for the specified determination procedure.
- Configuration Issues: There may be configuration issues in the controlling area or the cost element settings that lead to this mismatch.
- Missing or Incorrect Settings: The determination procedure may not be correctly set up in the system, or the necessary settings for the calculation base may be missing or incorrect.
Solutions:
Check Configuration:
- Go to the configuration settings for the determination procedure in the SAP system. You can do this through the following path:
- SPRO ? Controlling ? Cost Element Accounting ? Master Data ? Define Calculation Base for Cost Elements.
- Ensure that the calculation base for the cost element or internal order is correctly defined and matches the requirements of the determination procedure.
Review Determination Procedure:
- Verify the determination procedure being used (indicated by &1 / &2 in the error message). Check if it is correctly set up and if it is compatible with the calculation base you are trying to use.
Adjust Cost Element Settings:
- If the cost element is not set up correctly, you may need to adjust its settings. Ensure that the cost element is defined with the appropriate attributes and that it is assigned to the correct cost center or internal order.
Consult Documentation:
- Review SAP documentation or help resources related to cost element accounting and determination procedures to ensure that you are following the correct setup guidelines.
Testing:
- After making changes, perform tests to ensure that the error no longer occurs. Create a test transaction that uses the same cost element and determination procedure to verify that the issue is resolved.
Related Information:
OKB9
(for cost element settings) and OKB2
(for cost element master data) to access relevant configuration areas.If the problem persists after following these steps, it may be beneficial to consult with an SAP expert or your organization's SAP support team for further assistance.
Get instant SAP help. Start your 7-day free trial now.
K-323
Combination of determination procedure/DRR &1/&2 is not permitted
What causes this issue? You can only combine the determination procedure with the category "settlement risk" with a default risk rule with ...
K-322
The combination of country risk and settlement risk is not permitted
What causes this issue? You cannot combine country risk and settlement risk in the determination procedure. Settlement risk was specified in determin...
K-325
No recovery rate class could be determined for country risk country &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
K-326
The system was unable to determine the country default probability
What causes this issue? The system was unable to find an entry for valuation factor determination &v1& and risk commitment period &v3&...