How To Fix JO810 - XPRA report terminated because it was already executed


JO810 - Overview

  • Message type: E = Error

  • Message class: JO - Project Information System: All Overviews

  • Message number: 810

  • Message text: XPRA report terminated because it was already executed

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message JO810 - XPRA report terminated because it was already executed ?
    The SAP error message JO810 indicates that an XPRA (eXtended Program Run) report has been terminated because it has already been executed. This typically occurs during the upgrade or installation of SAP systems when certain processes are designed to run only once.
    
    Cause: Duplicate Execution: The XPRA report has already been executed in the system, and the system is trying to execute it again. Upgrade Issues: This can happen during system upgrades or when applying support packages if the XPRA is part of the upgrade process. System Configuration: The system may not be properly configured to handle the execution of XPRA reports, leading to premature termination.
    Solution: Check Execution Status: Use transaction code SE38 or SA38 to check the execution status of the XPRA report. You can look for the specific report that caused the error. You can also check the TSTC table for the transaction code associated with the XPRA to see if it has been

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant