How To Fix JO027 - Select a production resource/tool


JO027 - Overview

  • Message type: E = Error

  • Message class: JO - Project Information System: All Overviews

  • Message number: 027

  • Message text: Select a production resource/tool

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message JO027 - Select a production resource/tool ?
    The SAP error message JO027, which states "Select a production resource/tool," typically occurs in the context of production order processing or when trying to assign a production resource or tool (PRT) to a specific operation in a production order or process order.
    
    Cause: Missing Assignment: The production order or operation does not have a production resource/tool assigned to it. Incorrect Configuration: The system may not be configured correctly to recognize available production resources/tools. User Input Error: The user may have overlooked selecting a production resource/tool when creating or modifying the production order.
    Solution: Assign a Production Resource/Tool: Navigate to the production order in question. Go to the operation details where the error occurred. Look for the option to assign a production resource/tool. Select an appropriate PRT from the list and save the changes. Check Configuration: Ensure that the production resources/tools are properly defined in the system. Verify that the PRTs are assigned to the correct work centers and operations. Review User Permissions: Ensure that the

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author