How To Fix JIT00831 - For material &1 there are several JIT uncanceled scheduling agreements


SAP Error Message - Details

  • Message type: E = Error

  • Message class: JIT00 - JIT: Messages for JIT Process

  • Message number: 831

  • Message text: For material &1 there are several JIT uncanceled scheduling agreements

  • Show details Hide details
  • What causes this issue?

    On changing or creating a JIT scheduling agreement for material number
    &V1&, the system tried to read this material from the JIT material table
    in the temporary storage location. Several entries were found. Only one
    JIT scheduling agreement, which has not been cancelled can exist for
    each call component.
    There can be more than one scheduling agreement for a call component if
    these scheduling agreements differ in other characteristics, for example
    , have different unloading points, and these characteristics are taken i

    System Response

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.

    How to fix this error?

    For this material cancel all JIT scheduling agreements but one (
    <DS:TRAN.VOV8>VOV8</>.)
    If necessary delete the temporary storage with
    <DS:TRAN.JITR>Reorganization of the JIT basic data</>. The system then
    recreates the JIT material table (JITMA).

    Procedure for System Administrators


    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message JIT00831 - For material &1 there are several JIT uncanceled scheduling agreements ?
    The SAP error message JIT00831 indicates that there are multiple uncanceled Just-In-Time (JIT) scheduling agreements for a specific material. This situation can arise when the system detects that there are several active JIT agreements that have not been canceled, which can lead to confusion in the planning and delivery processes.
    
    Cause: Multiple Active Agreements: The primary cause of this error is the existence of multiple JIT scheduling agreements for the same material that have not been canceled. This can happen due to: Incorrect data entry when creating agreements. Lack of proper follow-up on previous agreements. System errors or mismanagement of agreements. Data Integrity Issues: There may be issues with data integrity in the system, leading to the system not recognizing that certain agreements should be canceled or are no longer valid.
    Solution: To resolve the JIT00831 error, you can follow these steps: Review Active Agreements: Go to the JIT scheduling agreement overview in SAP (transaction code ME33K or similar). Check for

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker