How To Fix JIT00814 - Action &1 carried out successfully


SAP Error Message - Details

  • Message type: E = Error

  • Message class: JIT00 - JIT: Messages for JIT Process

  • Message number: 814

  • Message text: Action &1 carried out successfully

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message JIT00814 - Action &1 carried out successfully ?

    The SAP error message JIT00814, which states "Action &1 carried out successfully," is not actually an error message in the traditional sense. Instead, it indicates that a specific action or process has been completed successfully within the Just-In-Time (JIT) processing framework in SAP.

    Cause:

    • The message is generated when a JIT-related action (like a delivery, production order, or other JIT-related processes) has been executed successfully. The "&1" in the message will typically be replaced with the specific action that was performed, such as "Delivery Created" or "Production Order Released."

    Solution:

    Since this message indicates success, there is no corrective action needed. However, if you are expecting an error or if the action did not yield the expected results, you may want to:

    1. Verify the Action: Check the details of the action that was performed to ensure it aligns with your expectations.
    2. Review Logs: Look at the application logs or transaction logs to see if there are any additional messages or warnings that could provide context.
    3. Follow-Up Actions: If the action was part of a larger process, ensure that subsequent steps are completed as expected.

    Related Information:

    • JIT Processing: JIT is a strategy that aligns raw-material orders from suppliers directly with production schedules. It is commonly used in manufacturing and supply chain management.
    • Transaction Codes: Familiarize yourself with relevant transaction codes related to JIT processing, such as JIT delivery creation or monitoring.
    • Documentation: Refer to SAP documentation or help files for more detailed information on JIT processes and the specific actions you are working with.

    If you encounter this message in a context where you expected an error or issue, it may be beneficial to consult with your SAP support team or refer to SAP Notes for any known issues related to the specific JIT process you are working with.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker