How To Fix JIT00346 - &1 has value &4 in scheduling agreement &2 in item &3


JIT00346 - Overview

  • Message type: E = Error

  • Message class: JIT00 - JIT: Messages for JIT Process

  • Message number: 346

  • Message text: &1 has value &4 in scheduling agreement &2 in item &3

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message JIT00346 - &1 has value &4 in scheduling agreement &2 in item &3 ?
    The SAP error message JIT00346 typically relates to issues with scheduling agreements in the Just-In-Time (JIT) environment. This error indicates that there is a mismatch or inconsistency in the values defined in the scheduling agreement for a specific item.
    
    Cause: The error message JIT00346 is triggered when: The value of a specific field (indicated by &4) in the scheduling agreement (indicated by &2) for the item (indicated by &3) does not meet the expected criteria or is inconsistent with the system's requirements. This could be due to incorrect data entry, configuration issues, or changes in the master data that have not been reflected in the scheduling agreement.
    Solution: To resolve the JIT00346 error, you can take the following steps: Check the Scheduling Agreement: Go to the scheduling agreement in question (transaction code ME33L). Verify the values for the item indicated in the error message. Pay special attention to the fields that are relevant to the JIT process. Review Configuration: Ensure that

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker