How To Fix /J7L/PRICING003 - Recycling partner assignment determined valid from &1 to &2


/J7L/PRICING003 - Overview

  • Message type: E = Error

  • Message class: /J7L/PRICING -

  • Message number: 003

  • Message text: Recycling partner assignment determined valid from &1 to &2

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /J7L/PRICING003 - Recycling partner assignment determined valid from &1 to &2 ?
    The SAP error message /J7L/PRICING003 Recycling partner assignment determined valid from &1 to &2 typically occurs in the context of pricing and partner determination in SAP, particularly in the recycling or waste management modules. This error indicates that there is an issue with the validity period of the recycling partner assignment.
    
    Cause: Invalid Date Range: The error suggests that the recycling partner assignment is not valid for the date range specified in the transaction. The dates &1 (start date) and &2 (end date) indicate the period during which the assignment is valid. Missing Partner Assignment: There may not be a valid partner assignment for the specified date range.
    Configuration Issues: The configuration settings for partner determination or pricing may not be set up correctly, leading to this error.
    Solution: Check Partner Assignment: Go to the relevant transaction (e.g., for maintaining partner assignments) and verify that the recycling partner is correctly assigned for the specified date range. Ensure that

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker