Message type: E = Error
Message class: J2 - Message Class for Development Class JBT
Message number: 584
Message text: &4 Select only one valuation alternative for each sequence
Only one calculation alternative can be set per sequence.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Choose either valuation using product costing, volume costing, or using
conditions (after having entered a costing sheet), or valuation using a
user exit that you have created. You do not need to maintain the
application if using volume costing.
Error message extract from SAP system. Copyright SAP SE.
J2584
- &4 Select only one valuation alternative for each sequence ?The SAP error message J2584 "&4 Select only one valuation alternative for each sequence" typically occurs in the context of product costing or valuation in SAP, particularly when dealing with multiple valuation alternatives in a costing run or when setting up a material master.
Cause:
This error arises when the system detects that multiple valuation alternatives have been selected for a single sequence in a costing run or valuation process. In SAP, each sequence should have a unique valuation alternative, and selecting more than one leads to ambiguity in how costs should be calculated or reported.
Solution:
To resolve this error, you need to ensure that only one valuation alternative is selected for each sequence in the relevant configuration or transaction. Here are the steps you can take:
Review the Configuration:
- Go to the relevant configuration settings in SAP where the valuation alternatives are defined (e.g., in the costing variant or material master).
- Check the sequences and ensure that each sequence has only one valuation alternative assigned.
Adjust the Costing Run:
- If you are running a costing run, review the settings for the costing variant and ensure that the valuation alternatives are correctly assigned.
- If necessary, modify the costing variant to select only one valuation alternative for each sequence.
Material Master Data:
- If the error is related to material master data, check the material master records for the relevant materials and ensure that the valuation alternatives are set up correctly.
Consult Documentation:
- Refer to SAP documentation or help resources for specific guidance on the configuration of valuation alternatives and sequences.
Testing:
- After making the necessary adjustments, re-run the costing or valuation process to verify that the error has been resolved.
Related Information:
If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in product costing.
Get instant SAP help. Start your 7-day free trial now.
J2583
&4 Specify a number of units (ASTUECK)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
J2582
&4 Initial value can not be transferred to the required field
What causes this issue? An empty (or zero valued) field was found during the reconcilliation. The field to be reconciled, however, is required.System...
J2585
&4 System could not run database operation
What causes this issue? Database operation could not be completed.System Response Process has been terminated.How to fix this error? Inform your sy...
J2586
&4 (Company code &1, transaction &2) invalid rollover removed
What causes this issue? SAP-Banking cash flows (rollovers) were found for this transaction, for which the fixed interest rate periods no longer exist...