Do you have any question about this error?
Message type: E = Error
Message class: J# -
Message number: 427
Message text: Choose a smaller time unit for the subincrement (&1)
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
J#427
- Choose a smaller time unit for the subincrement (&1) ?The SAP error message J#427, which states "Choose a smaller time unit for the subincrement (&1)," typically occurs in the context of time-related calculations or configurations in SAP, particularly in modules like Production Planning (PP) or Project System (PS). This error indicates that the time unit specified for a subincrement is too large for the system to process.
Cause:
- Time Unit Configuration: The error usually arises when the time unit defined for a subincrement (e.g., hours, days) is larger than what the system can handle for the specific operation or process.
- Data Entry: Users may have entered a time value that exceeds the allowed limits for the specific context in which they are working.
- System Settings: The configuration settings in the SAP system may not align with the requirements of the specific transaction or process.
Solution:
- Adjust Time Unit: Review the time unit settings for the subincrement and select a smaller time unit. For example, if the current setting is in hours, consider changing it to minutes.
- Check Configuration: Navigate to the relevant configuration settings in SAP (e.g., in SPRO) and ensure that the time units are set correctly for the processes you are working with.
- Data Validation: Ensure that the data being entered adheres to the expected formats and limits. Validate the input values to ensure they are within acceptable ranges.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidelines on time unit settings for the module you are working with.
Related Information:
If the problem persists after trying the above solutions, it may be beneficial to consult with your SAP support team or a technical consultant who can provide more in-depth assistance based on your specific system configuration and usage.
Get instant SAP help. Start your 7-day free trial now.
J#426
Due date scenario &1 was transported
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
J#425
Position &1 was created for fictitious risk objects
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
J#428
Choose a smaller subincrement (&1)
isbrmWhat causes this issue? The selected subincrement for the creation of the tranche cannot be used in combination with the selected increment for...
J#429
Combination of base amount + time unit for subincrement is not permitted
isbrmWhat causes this issue? The combination of due date scenario with a base amount, and a period block with a time unit for the subincrement is no...
Click on this link to search all SAP messages.