Do you have any question about this error?
Message type: E = Error
Message class: IWP - Messages for IWP
Message number: 516
Message text: No jobs scheduled for this audit package
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
IWP516
- No jobs scheduled for this audit package ?The SAP error message IWP516: No jobs scheduled for this audit package typically occurs in the context of the SAP Integrated Workforce Planning (IWP) module, particularly when dealing with audit packages. This message indicates that there are no jobs currently scheduled for the specified audit package, which can hinder the auditing process.
Causes:
- No Jobs Created: The most common cause is that no jobs have been created or scheduled for the audit package in question.
- Incorrect Configuration: There may be a configuration issue where the audit package is not properly linked to any jobs.
- Job Scheduling Issues: There could be issues with the job scheduling system in SAP, preventing jobs from being created or executed.
- Authorization Issues: The user may not have the necessary authorizations to view or schedule jobs for the audit package.
Solutions:
- Create Jobs: Ensure that jobs are created and scheduled for the audit package. This can typically be done through the relevant transaction codes or configuration settings in SAP.
- Check Configuration: Review the configuration settings for the audit package to ensure that it is correctly set up to link with jobs.
- Job Scheduling: Use transaction codes like
SM37
to check the job scheduling status and ensure that jobs are being processed as expected.- Authorization Check: Verify that the user has the necessary authorizations to access and manage jobs related to the audit package.
- Consult Documentation: Refer to SAP documentation or help resources for specific instructions on how to create and manage jobs for audit packages.
Related Information:
IW38
(for managing work orders) and SM37
(for monitoring jobs).By following these steps, you should be able to resolve the IWP516 error and ensure that jobs are properly scheduled for your audit package.
Get instant SAP help. Start your 7-day free trial now.
IWP515
Select the BI object type (DSO or InfoCube) to be created
What causes this issue? You did not select the BI object type to be created for the selected structures of the audit package (during extraction into ...
IWP514
No audit package selected
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
IWP517
Run cleanup in BI before deleting audit package: &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
IWP518
No BI content for this audit package: &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.