Do you have any question about this error?
Message type: E = Error
Message class: /ISDFPS/PM_RELOC_CHK -
Message number: 269
Message text: WBS element in equipment: &; in structure element: &
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/ISDFPS/PM_RELOC_CHK269
- WBS element in equipment: &; in structure element: & ?The SAP error message
/ISDFPS/PM_RELOC_CHK269
typically relates to issues with Work Breakdown Structure (WBS) elements in the context of equipment relocation or project management. This error indicates that there is a problem with the WBS element associated with the equipment in the specified structure element.Cause:
- Invalid WBS Element: The WBS element specified may not be valid or may not exist in the system.
- Incorrect Assignment: The equipment may not be correctly assigned to the WBS element, or the assignment may not be allowed based on the project structure.
- Status Issues: The WBS element or the project may be in a status that does not allow for the relocation of equipment.
- Authorization Issues: The user may not have the necessary authorizations to perform actions related to the specified WBS element or equipment.
Solution:
- Verify WBS Element: Check if the WBS element exists and is correctly defined in the system. You can do this by navigating to the WBS element in the project structure.
- Check Equipment Assignment: Ensure that the equipment is correctly assigned to the WBS element. You may need to reassign the equipment if there are discrepancies.
- Review Project Status: Make sure that the project and WBS element are in a status that allows for equipment relocation. If the project is closed or in a status that restricts changes, you may need to change the status or consult with a project manager.
- Authorization Check: Ensure that the user has the necessary permissions to perform the relocation. If not, contact your SAP security administrator to obtain the required authorizations.
- Consult Documentation: Review any relevant SAP documentation or notes related to this error message for additional context or specific troubleshooting steps.
Related Information:
CJ20N
(Project Builder) or IW39
(Display PM Orders) to investigate the WBS elements and equipment assignments.By following these steps, you should be able to identify the root cause of the error and implement a solution.
Get instant SAP help. Start your 7-day free trial now.
/ISDFPS/PM_RELOC_CHK268
Responsible cost center in equipment: &; in structure element: &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/ISDFPS/PM_RELOC_CHK267
Responsible work center in equipment: &; in structure element: &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/ISDFPS/PM_RELOC_CHK270
Respsnble.work center in functional location: &; in structure element: &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/ISDFPS/PM_RELOC_CHK271
Respnsble cost center in functional location: &; in structure element: &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.