Do you have any question about this error?
Message type: E = Error
Message class: /ISDFPS/OM -
Message number: 601
Message text: Object &1 is already assigned to WBS element &2
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/ISDFPS/OM601
- Object &1 is already assigned to WBS element &2 ?The SAP error message
/ISDFPS/OM601 Object &1 is already assigned to WBS element &2
typically occurs in the context of project management and financials within SAP, particularly when dealing with Work Breakdown Structures (WBS) and project-related objects.Cause:
This error indicates that the object you are trying to assign (represented by
&1
) is already linked to another WBS element (represented by&2
). In SAP, each object can only be assigned to one WBS element at a time. This restriction is in place to maintain the integrity of project structures and financial reporting.Solution:
To resolve this error, you can take the following steps:
Check Current Assignments:
- Use transaction codes like
CJ20N
(Project Builder) orCJ03
(Display Project) to check where the object is currently assigned. This will help you identify the WBS element it is linked to.Reassign the Object:
- If you need to assign the object to a different WBS element, you will first need to remove the existing assignment. This can typically be done in the same transaction where you checked the assignments.
- Navigate to the current WBS element and remove the assignment of the object.
Assign to New WBS Element:
- After removing the assignment, you can then proceed to assign the object to the desired WBS element.
Consult Documentation:
- If you are unsure about the implications of changing assignments, consult your project management documentation or speak with a project manager or SAP consultant.
Check for Locks:
- Ensure that there are no locks on the object or WBS element that might prevent changes. You can check for locks using transaction
SM12
.Related Information:
CJ20N
, CJ03
, CJ02
, and CJ01
for managing WBS elements and project structures.By following these steps, you should be able to resolve the error and manage your project assignments effectively.
Get instant SAP help. Start your 7-day free trial now.
/ISDFPS/OM600
& & &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/ISDFPS/OM557
Function '&1' already exists
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/PF1/MSG_GUI125
Logical file name &1 does not exist on the server
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/PF1/MSG_GUI126
Server file is proposed by Customizing
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.