Do you have any question about this error?
Message type: E = Error
Message class: /ISDFPS/MSG_GAF_PE -
Message number: 091
Message text: Item &1: The planned end date must not be before the start date
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/ISDFPS/MSG_GAF_PE091
- Item &1: The planned end date must not be before the start date ?The SAP error message
/ISDFPS/MSG_GAF_PE091
indicates that there is a problem with the planned end date of an item in a planning scenario. Specifically, the error states that the planned end date must not be before the start date. This typically occurs in the context of project planning, production planning, or similar modules where dates are critical for scheduling and resource allocation.Cause:
- Incorrect Date Entry: The most common cause is that the user has entered a planned end date that is earlier than the planned start date for the item.
- Data Migration Issues: If data has been migrated from another system or manually uploaded, there may be inconsistencies in the date fields.
- System Configuration: There may be configuration settings in the system that enforce date validation rules, leading to this error if the rules are not met.
Solution:
- Check Dates: Review the planned start and end dates for the item in question. Ensure that the planned end date is set to a date that is equal to or later than the planned start date.
- Correct the Entry: If the planned end date is incorrect, update it to a valid date that meets the requirement.
- Validation Rules: If this error occurs frequently, check if there are any validation rules or settings in the system that might be causing this issue. Adjust them if necessary.
- Data Consistency: If the data was migrated, perform a data consistency check to ensure that all date fields are correctly populated.
- User Training: Ensure that users are trained on how to enter dates correctly in the system to avoid this error in the future.
Related Information:
By following these steps, you should be able to resolve the error and ensure that your planning data is accurate and valid.
Get instant SAP help. Start your 7-day free trial now.
/ISDFPS/MSG_GAF_PE090
Item &1: Storage location &2 is not defined as central SLoc in plant &3
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/ISDFPS/MSG_GAF_PE089
Item &1: Storage location &2 does not exist in plant &3
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/ISDFPS/MSG_GAF_PE092
Item &1: The start date must not be in the past
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/ISDFPS/MSG_GAF_PE093
Errors occurred when unpacking handling unit &1:
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.