How To Fix /ISDFPS/FDPDAMPO212 - Relocation is planned until &1; delivery date is not possible


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /ISDFPS/FDPDAMPO -

  • Message number: 212

  • Message text: Relocation is planned until &1; delivery date is not possible

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /ISDFPS/FDPDAMPO212 - Relocation is planned until &1; delivery date is not possible ?
    The SAP error message /ISDFPS/FDPDAMPO212 indicates that a relocation is planned until a specified date, but the delivery date for the related process is not feasible. This error typically arises in the context of SAP's Advanced Planning and Optimization (APO) or Supply Chain Management (SCM) modules, particularly when dealing with planning and logistics.
    
    Cause: Date Mismatch: The planned relocation date exceeds the delivery date, making it impossible to fulfill the relocation within the required timeframe. Resource Constraints: There may be constraints related to resources, such as capacity limitations or availability of materials, that prevent the relocation from being completed by the delivery date.
    Configuration Issues: Incorrect settings in the planning parameters or master data can lead to conflicts between planned activities and delivery schedules. Planning Horizon: The planning horizon may not be set correctly, leading to unrealistic planning scenarios.
    Solution: Adjust Dates: Review and adjust the planned relocation date or the delivery date to ensure they align.

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author