How To Fix /ISDFPS/FDP_REL071 - Reloc. &1: 'Planned from' date greater than/equal to 'Planned to' date


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /ISDFPS/FDP_REL -

  • Message number: 071

  • Message text: Reloc. &1: 'Planned from' date greater than/equal to 'Planned to' date

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /ISDFPS/FDP_REL071 - Reloc. &1: 'Planned from' date greater than/equal to 'Planned to' date ?

    The SAP error message /ISDFPS/FDP_REL071 indicates that there is an issue with the planned dates in a relocation or planning scenario. Specifically, the error states that the 'Planned from' date is greater than or equal to the 'Planned to' date, which is not allowed in the system.

    Cause:

    This error typically occurs in scenarios where you are trying to create or modify a relocation or planning record, and the dates you have entered do not follow the required chronological order. The 'Planned from' date must always be earlier than the 'Planned to' date to ensure that the planning logic is valid.

    Solution:

    To resolve this error, you should:

    1. Check the Dates: Review the 'Planned from' and 'Planned to' dates in your relocation or planning record. Ensure that the 'Planned from' date is set to a date that is earlier than the 'Planned to' date.

    2. Correct the Dates: If you find that the dates are incorrect, update the 'Planned from' date to a date that is earlier than the 'Planned to' date.

    3. Validation: After making the changes, validate the record again to ensure that the error is resolved.

    4. Save Changes: Once the dates are corrected and validated, save the changes to the record.

    Related Information:

    • Date Formats: Ensure that the dates are entered in the correct format as per your system's configuration.
    • User Permissions: Make sure you have the necessary permissions to edit the records in question.
    • Documentation: Refer to the SAP documentation or help files related to the specific module you are working with for additional context on date handling and planning processes.
    • Consult with Colleagues: If you are unsure about the correct dates to use, consult with colleagues or stakeholders involved in the planning process.

    By following these steps, you should be able to resolve the error and proceed with your planning or relocation activities in SAP.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author