How To Fix /ISDFPS/FDP362 - Maximum relationship period for op./exercise &1, contingent &2 is &3-&4


/ISDFPS/FDP362 - Overview

  • Message type: E = Error

  • Message class: /ISDFPS/FDP -

  • Message number: 362

  • Message text: Maximum relationship period for op./exercise &1, contingent &2 is &3-&4

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /ISDFPS/FDP362 - Maximum relationship period for op./exercise &1, contingent &2 is &3-&4 ?
    The SAP error message /ISDFPS/FDP362 typically relates to the Flexible Real Estate Management (RE-FX) module, specifically dealing with the management of relationships between operational activities and contingent liabilities or rights. This error indicates that the maximum relationship period for a specific operational activity and contingent liability has been exceeded.
    
    Cause: The error message is triggered when: The relationship period defined for an operational activity (op.) and a contingent liability (contingent) exceeds the maximum allowed period set in the system. The parameters for the relationship period are not configured correctly, or the data being processed violates the defined limits.
    Solution: To resolve this error, you can take the following steps: Check Configuration Settings: Review the configuration settings for the maximum relationship period in the system. This can usually be found in the customizing settings for RE-FX. Ensure that the maximum relationship period is set according to your business requirements. Review Data Entries: Check the specific operational activity and contingent liability that triggered

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author