Do you have any question about this error?
Message type: E = Error
Message class: /ISDFPS/FDP -
Message number: 302
Message text: Enter a start date for the copied structure
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/ISDFPS/FDP302
- Enter a start date for the copied structure ?The SAP error message
/ISDFPS/FDP302 Enter a start date for the copied structure
typically occurs in the context of the SAP Flexible Planning (FDP) module, particularly when working with planning layouts or structures. This error indicates that a required field, specifically the start date for a copied planning structure, has not been filled in.Cause:
The error is triggered when you attempt to copy a planning structure or layout without specifying a start date. The system requires a start date to define the time frame for the copied structure, and if this information is missing, it cannot proceed with the operation.
Solution:
To resolve this error, follow these steps:
Identify the Transaction: Determine which transaction or screen you are on when the error occurs. This will help you understand the context of the operation.
Locate the Start Date Field: Look for the field labeled "Start Date" or similar in the screen where you are copying the structure.
Enter a Valid Start Date: Input a valid start date that corresponds to the planning period you are working with. Ensure that the date is within the acceptable range for your planning scenario.
Save or Execute: After entering the start date, try to save or execute the operation again.
Check for Additional Required Fields: If the error persists, ensure that there are no other mandatory fields that need to be filled in before proceeding.
Related Information:
By following these steps, you should be able to resolve the error and successfully copy the planning structure with the required start date.
Get instant SAP help. Start your 7-day free trial now.
/ISDFPS/FDP301
Enter the object ID of the object that is to be copied
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/ISDFPS/FDP300
Select a force element
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/ISDFPS/FDP303
Enter an end date for the copied structure
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/ISDFPS/FDP304
Start date for the structure must be today or in the future
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.