How To Fix /ISDFPS/DGCL7CHECK033 - Activity item: actual value &1 exceeds limit &2


/ISDFPS/DGCL7CHECK033 - Overview

  • Message type: E = Error

  • Message class: /ISDFPS/DGCL7CHECK -

  • Message number: 033

  • Message text: Activity item: actual value &1 exceeds limit &2

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /ISDFPS/DGCL7CHECK033 - Activity item: actual value &1 exceeds limit &2 ?
    The SAP error message /ISDFPS/DGCL7CHECK033 indicates that an activity item has an actual value that exceeds a predefined limit. This error typically occurs in the context of SAP's Project System (PS) or related modules where budgetary controls or limits are enforced.
    
    Cause: The error is triggered when the actual value of a specific activity item surpasses the limit set for that item. This can happen due to various reasons, such as: Budget Overrun: The actual costs incurred for an activity exceed the budgeted amount. Incorrect Configuration: The limits may not be set correctly in the system, leading to false positives. Data Entry Errors: Incorrect data entry during the posting of costs or activities can lead to inflated actual values. Changes in Project Scope: If the scope of the project changes, it may lead to increased costs that exceed the original limits.
    Solution: To resolve this error, you can take the following steps: Review the Activity Item: Check the specific

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant