How To Fix /ISDFPS/ACCMSG078 - WBS element &1 is not assigned to controlling area &2


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /ISDFPS/ACCMSG -

  • Message number: 078

  • Message text: WBS element &1 is not assigned to controlling area &2

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /ISDFPS/ACCMSG078 - WBS element &1 is not assigned to controlling area &2 ?

    The SAP error message /ISDFPS/ACCMSG078 indicates that a Work Breakdown Structure (WBS) element is not assigned to the specified controlling area. This error typically arises in the context of project management and controlling within SAP, particularly when trying to perform operations that require a valid assignment of the WBS element to a controlling area.

    Cause:

    1. WBS Element Not Assigned: The WBS element you are trying to use is not assigned to the controlling area you are working with.
    2. Incorrect Controlling Area: The controlling area specified in your transaction does not match the controlling area assigned to the WBS element.
    3. Data Entry Error: There may be a mistake in the data entry, such as using the wrong WBS element or controlling area.
    4. Project Structure Issues: The project structure may not be properly set up, leading to inconsistencies in assignments.

    Solution:

    1. Check WBS Element Assignment:

      • Go to the WBS element in question and check its assignment to the controlling area. You can do this by navigating to the WBS element in the Project System (PS) module and reviewing its details.
      • Use transaction code CJ20N (Project Builder) to view the WBS element and its properties.
    2. Assign WBS Element to Controlling Area:

      • If the WBS element is not assigned to the correct controlling area, you can assign it by using transaction code CJ02 (Change WBS Element).
      • Ensure that the WBS element is assigned to the correct controlling area that you are working with.
    3. Verify Controlling Area Settings:

      • Check the controlling area settings in the configuration to ensure that the WBS element is correctly linked to the controlling area.
      • Use transaction code OKKP to review the controlling area settings.
    4. Consult with Project Management:

      • If you are unsure about the correct assignments, consult with your project management or controlling team to ensure that the WBS elements and controlling areas are set up correctly.
    5. Review Authorization:

      • Ensure that you have the necessary authorizations to view and modify the WBS elements and controlling area assignments.

    Related Information:

    • Transaction Codes:
      • CJ20N: Project Builder
      • CJ02: Change WBS Element
      • OKKP: Controlling Area Settings
    • SAP Notes: Check for any relevant SAP Notes that may address specific issues related to this error message.
    • Documentation: Review SAP documentation related to Project System (PS) and Controlling (CO) for more detailed information on WBS elements and controlling area assignments.

    By following these steps, you should be able to resolve the error message and ensure that your WBS elements are correctly assigned to the appropriate controlling areas.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author