How To Fix IPPECIF214 - Change state of the scheme only exists in the SAP ERP system


IPPECIF214 - Overview

  • Message type: E = Error

  • Message class: IPPECIF - Messages for APO CIP Interfaces in iPPE

  • Message number: 214

  • Message text: Change state of the scheme only exists in the SAP ERP system

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message IPPECIF214 - Change state of the scheme only exists in the SAP ERP system ?
    The SAP error message IPPECIF214, which states "Change state of the scheme only exists in the SAP ERP system," typically occurs in the context of SAP Integrated Business Planning (IBP) when there is an inconsistency between the planning data in IBP and the data in the SAP ERP system. This error often arises during the data integration process or when trying to synchronize planning data between the two systems.
    
    Cause: Data Inconsistency: The error usually indicates that the change state of a planning scheme (like a planning version or a planning area) is not properly synchronized between SAP IBP and SAP ERP.
    Configuration Issues: There may be configuration issues in the integration settings between IBP and ERP. Missing Data: The required data or configuration in the ERP system may be missing or not properly set up. Versioning Issues: The version of the planning scheme in IBP may not match the version in the ERP system.
    Solution: Check

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author