How To Fix IP890 - Key-date scheduling for strategy is not possible


SAP Error Message - Details

  • Message type: E = Error

  • Message class: IP - Messages for preventive maintenance

  • Message number: 890

  • Message text: Key-date scheduling for strategy is not possible

  • Show details Hide details
  • What causes this issue?

    You tried to change the scheduling indicator of a strategy to "Time -
    Key-Date".
    If you want to use a strategy with the scheduling indicator "Time - Key
    Date", all maintenance packages or cycles must last for at least one
    month. This prerequisite is not fulfilled.

    System Response

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.

    How to fix this error?

    Assign a value of at least one month or multiples of a month to the
    maintenance packages and cycles and then change the scheduling indicator
    in the strategy to "Time - Key Date". You could also select another
    scheduling indicator, for example, "Time - Factory Calendar"

    Procedure for System Administrators


    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message IP890 - Key-date scheduling for strategy is not possible ?

    The SAP error message IP890 ("Key-date scheduling for strategy is not possible") typically occurs in the context of production planning and scheduling, particularly when using the planning strategies in SAP's Integrated Business Planning (IBP) or Production Planning (PP) modules. This error indicates that the system is unable to perform scheduling based on the key date specified in the planning strategy.

    Causes:

    1. Invalid Key Date: The key date specified for scheduling may not be valid or may fall outside the permissible range for the planning strategy.
    2. Missing Master Data: Required master data (like material master, work center, or routing) may be missing or incorrectly configured.
    3. Planning Strategy Configuration: The planning strategy may not be set up correctly, or the parameters for the strategy may not align with the key date.
    4. Capacity Constraints: There may be capacity constraints that prevent scheduling on the specified key date.
    5. Calendar Settings: The factory calendar or holiday settings may not allow for scheduling on the specified key date.

    Solutions:

    1. Check Key Date: Verify that the key date you are using for scheduling is valid and falls within the acceptable range for the planning strategy.
    2. Review Master Data: Ensure that all necessary master data is correctly maintained and available. Check the material master, work center, and routing for any inconsistencies.
    3. Validate Planning Strategy: Review the configuration of the planning strategy in the system. Ensure that it is set up correctly and that all parameters are appropriate for the key date.
    4. Examine Capacity: Check for any capacity constraints that may be affecting the scheduling. Ensure that there is sufficient capacity available for the planned operations.
    5. Check Calendar Settings: Review the factory calendar settings to ensure that the key date is not a holiday or non-working day that would prevent scheduling.
    6. Run Planning Run: If applicable, try running a planning run to see if it resolves the issue. Sometimes, re-running the planning process can help in recalibrating the scheduling.

    Related Information:

    • Transaction Codes: You may need to use transaction codes like MD01 (MRP Run), MD02 (Single-item, single-level planning), or IP01 (Create Planning Strategy) to access relevant planning functions.
    • SAP Notes: Check SAP Notes for any known issues or patches related to this error message. SAP frequently updates its knowledge base with solutions to common problems.
    • Documentation: Refer to SAP documentation for detailed information on planning strategies and scheduling processes. This can provide insights into how to configure and troubleshoot scheduling issues.

    If the problem persists after trying the above solutions, it may be beneficial to consult with your SAP support team or a consultant who specializes in SAP PP or IBP for further assistance.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant