Message type: E = Error
Message class: IP - Messages for preventive maintenance
Message number: 890
Message text: Key-date scheduling for strategy is not possible
You tried to change the scheduling indicator of a strategy to "Time -
Key-Date".
If you want to use a strategy with the scheduling indicator "Time - Key
Date", all maintenance packages or cycles must last for at least one
month. This prerequisite is not fulfilled.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Assign a value of at least one month or multiples of a month to the
maintenance packages and cycles and then change the scheduling indicator
in the strategy to "Time - Key Date". You could also select another
scheduling indicator, for example, "Time - Factory Calendar"
Error message extract from SAP system. Copyright SAP SE.
IP890
- Key-date scheduling for strategy is not possible ?The SAP error message IP890 ("Key-date scheduling for strategy is not possible") typically occurs in the context of production planning and scheduling, particularly when using the planning strategies in SAP's Integrated Business Planning (IBP) or Production Planning (PP) modules. This error indicates that the system is unable to perform scheduling based on the key date specified in the planning strategy. Causes: Invalid Key Date: The key date specified for scheduling may not be valid or may fall outside the permissible range for the planning strategy. Missing Master Data: Required master data (like material master, work center, or routing) may be missing or incorrectly configured. Planning Strategy Configuration: The planning strategy may not be set up correctly, or the parameters for the strategy may not align with the key date. Capacity Constraints: There may be capacity constraints that prevent scheduling on the specified key date. Calendar Settings: The factory calendar or holiday settings may not allow for
Get instant SAP help. Sign up for our Free Essentials Plan.
IP889
Planned date for maintenance plan &1 was scheduled for 00.00.0000
What causes this issue? During scheduling of the maintenance plan, the planned date was set to 00.00.0000. This error can occur, if, for example, the...
IP888
Enh. multiple counter plan can no longer be deactivated after the save
What causes this issue? You cannot reset the activation of the enhancement for multiple counter plans after saving. Deactivating the enhancement is n...
IP891
Order simulation for task list group &1 is not correct
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
IP893
Field name &1 not found in maintenance plan header &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.