How To Fix IP429 - Call horizon > 100% is not allowed


SAP Error Message - Details

  • Message type: E = Error

  • Message class: IP - Messages for preventive maintenance

  • Message number: 429

  • Message text: Call horizon > 100% is not allowed

  • Show details Hide details
  • What causes this issue?

    You have entered an opening period of greater than 100%.

    System Response

    The maximum possible value is 100%.
    The call is made on the planned date in the case of an opening period
    of 100%; when the opening period is 0%, the call is made when the
    previous call is confirmed as completed.

    How to fix this error?

    Correct your entry.

    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message IP429 - Call horizon > 100% is not allowed ?

    The SAP error message IP429 "Call horizon > 100% is not allowed" typically occurs in the context of production planning and scheduling, particularly when dealing with capacity planning in SAP's Integrated Planning (IP) module. This error indicates that the planned capacity utilization exceeds 100%, which is not permissible in the system.

    Cause:

    1. Excessive Demand: The planned production or demand exceeds the available capacity of the resources (work centers, machines, etc.).
    2. Incorrect Planning Parameters: The planning parameters or settings may not be correctly configured, leading to unrealistic capacity utilization.
    3. Overlapping Orders: Multiple production orders may be scheduled to run simultaneously on the same resource, causing the total utilization to exceed 100%.
    4. Capacity Constraints: The capacity of the work center may not be sufficient to handle the planned workload.

    Solution:

    1. Review Capacity Planning:

      • Check the capacity of the relevant work centers and ensure that they are correctly defined in the system.
      • Adjust the available capacity if necessary, considering factors like shifts, maintenance, and downtime.
    2. Adjust Production Plans:

      • Re-evaluate the production plan to ensure that the demand does not exceed the available capacity.
      • Consider rescheduling or delaying some production orders to balance the load.
    3. Modify Planning Parameters:

      • Review and adjust the planning parameters in the system to ensure they reflect realistic production capabilities and constraints.
    4. Use Capacity Evaluation Tools:

      • Utilize SAP's capacity evaluation tools to analyze the load on work centers and identify bottlenecks.
      • Use transaction codes like CM01 (Capacity Planning) to visualize and manage capacity utilization.
    5. Check for Overlapping Orders:

      • Ensure that there are no overlapping production orders that could be causing the capacity to exceed 100%.
      • If necessary, stagger the start times of production orders to avoid conflicts.
    6. Consult Documentation:

      • Refer to SAP documentation or help resources for specific guidance on capacity planning and the IP module.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as CM01 (Capacity Planning), CM21 (Capacity Leveling), and IP01 (Interactive Planning).
    • SAP Notes: Check SAP Notes for any known issues or patches related to this error message.
    • Training and Support: Consider training for users involved in production planning to better understand capacity management and planning processes in SAP.

    By addressing the underlying causes and implementing the suggested solutions, you should be able to resolve the IP429 error and ensure that your production planning aligns with available capacity.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant