How To Fix IP425 - Original schedule restored


SAP Error Message - Details

  • Message type: E = Error

  • Message class: IP - Messages for preventive maintenance

  • Message number: 425

  • Message text: Original schedule restored

  • Show details Hide details
  • What causes this issue?

    You have refreshed the scheduling results that were determined during
    the ongoing processing of the maintenance plan.

    System Response

    Scheduling is reset in its original state.

    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message IP425 - Original schedule restored ?

    The SAP error message IP425, which states "Original schedule restored," typically occurs in the context of production planning and scheduling within the SAP system. This message indicates that the system has reverted a planned order or production order to its original schedule due to certain conditions not being met or changes that have been made.

    Causes:

    1. Manual Changes: If a user manually changes the schedule of a production order or planned order, and the system detects that these changes cannot be processed (due to constraints like capacity, material availability, etc.), it may revert to the original schedule.
    2. Capacity Constraints: If there are capacity issues in the work center or production line, the system may not be able to accommodate the new schedule.
    3. Material Availability: If the required materials are not available for the new schedule, the system will revert to the original schedule.
    4. Dependencies and Constraints: Other dependent orders or constraints in the production process may prevent the new schedule from being valid.

    Solutions:

    1. Check Capacity: Review the capacity of the work centers involved. Ensure that there is enough capacity to accommodate the new schedule.
    2. Material Availability Check: Verify that all necessary materials are available for the planned production. If materials are missing, arrange for procurement or adjust the schedule accordingly.
    3. Review Dependencies: Check for any dependencies or constraints that may be affecting the scheduling. This includes looking at other orders that may be linked to the one you are trying to schedule.
    4. Re-schedule: If the original schedule is not suitable, try to re-schedule the order after addressing the issues identified in the previous steps.
    5. Consult Documentation: Refer to SAP documentation or help resources for specific details related to the error message and its context.

    Related Information:

    • Transaction Codes: You may want to use transaction codes like CO02 (Change Production Order) or MD04 (Stock/Requirements List) to analyze the situation further.
    • SAP Notes: Check SAP Notes for any known issues or patches related to this error message.
    • User Forums: Engage with SAP community forums or user groups for insights from other users who may have encountered similar issues.

    If the problem persists after trying the above solutions, it may be beneficial to consult with your SAP support team or a technical consultant who can provide more in-depth analysis and assistance.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant