Do you have any question about this error?
Message type: E = Error
Message class: IP - Messages for preventive maintenance
Message number: 425
Message text: Original schedule restored
You have refreshed the scheduling results that were determined during
the ongoing processing of the maintenance plan.
Scheduling is reset in its original state.
Error message extract from SAP system. Copyright SAP SE.
IP425
- Original schedule restored ?The SAP error message IP425, which states "Original schedule restored," typically occurs in the context of production planning and scheduling within the SAP system. This message indicates that the system has reverted a planned order or production order to its original schedule due to certain conditions not being met or changes that have been made.
Causes:
- Manual Changes: If a user manually changes the schedule of a production order or planned order, and the system detects that these changes cannot be processed (due to constraints like capacity, material availability, etc.), it may revert to the original schedule.
- Capacity Constraints: If there are capacity issues in the work center or production line, the system may not be able to accommodate the new schedule.
- Material Availability: If the required materials are not available for the new schedule, the system will revert to the original schedule.
- Dependencies and Constraints: Other dependent orders or constraints in the production process may prevent the new schedule from being valid.
Solutions:
- Check Capacity: Review the capacity of the work centers involved. Ensure that there is enough capacity to accommodate the new schedule.
- Material Availability Check: Verify that all necessary materials are available for the planned production. If materials are missing, arrange for procurement or adjust the schedule accordingly.
- Review Dependencies: Check for any dependencies or constraints that may be affecting the scheduling. This includes looking at other orders that may be linked to the one you are trying to schedule.
- Re-schedule: If the original schedule is not suitable, try to re-schedule the order after addressing the issues identified in the previous steps.
- Consult Documentation: Refer to SAP documentation or help resources for specific details related to the error message and its context.
Related Information:
CO02
(Change Production Order) or MD04
(Stock/Requirements List) to analyze the situation further.If the problem persists after trying the above solutions, it may be beneficial to consult with your SAP support team or a technical consultant who can provide more in-depth analysis and assistance.
Get instant SAP help. Start your 7-day free trial now.
IP424
More scheduling records will be created
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
IP423
No start offset has been set
What causes this issue? You have tried to start a maintenance plan within the cycle. The present position in the maintenance cycle is determined by t...
IP426
Maintenance plan & still without maintenance packages
What causes this issue? The <GL:maintenance_item>maintenance items</> allocated to the <GL:preventive_maintenance_plan>maintenance ...
IP427
New completion confirmation date < start date &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...