How To Fix IP100 - Unit of measure & is not time-based


SAP Error Message - Details

  • Message type: E = Error

  • Message class: IP - Messages for preventive maintenance

  • Message number: 100

  • Message text: Unit of measure & is not time-based

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message IP100 - Unit of measure & is not time-based ?
    The SAP error message IP100, which states "Unit of measure & is not time-based," typically occurs in the context of production planning or maintenance planning when the system expects a time-based unit of measure but receives a different type. This error can arise in various scenarios, such as when creating or processing maintenance plans, work orders, or production orders.
    
    Cause: Incorrect Unit of Measure: The unit of measure (UoM) specified in the planning or order is not defined as a time-based UoM in the system. For example, if the system expects a UoM like "hours" or "days" but receives "pieces" or "liters," this error will occur.
    Configuration Issues: The configuration settings in the SAP system may not be set up correctly to recognize the UoM as time-based. Master Data Issues: The material master or other relevant master data may have incorrect or incomplete UoM settings.
    Solution: Check the Unit of Measure: Verify the UoM being used

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author