How To Fix INM_OF_PROJECT009 - Project &1 is currently being processed by another user


SAP Error Message - Details

  • Message type: E = Error

  • Message class: INM_OF_PROJECT - Messages related to implemenation class CL_INM_OF_PROJECT

  • Message number: 009

  • Message text: Project &1 is currently being processed by another user

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message INM_OF_PROJECT009 - Project &1 is currently being processed by another user ?

    The SAP error message INM_OF_PROJECT009 indicates that a project (identified by the project number &1) is currently being processed by another user. This typically occurs in the context of project management within SAP, particularly when multiple users are trying to access or modify the same project simultaneously.

    Cause:

    1. Concurrent Access: Another user has locked the project for editing or processing. This can happen if a user is currently working on the project or has not properly released the lock after their session.
    2. Session Timeout: If a user was working on the project and their session timed out without properly releasing the lock, the project may still appear as being processed by that user.
    3. System Issues: Occasionally, system errors or inconsistencies can lead to locks not being released properly.

    Solution:

    1. Wait and Retry: The simplest solution is to wait for the other user to finish their work and release the lock. You can periodically check if the project is available for editing.
    2. Check Lock Entries: Use transaction code SM12 to check for lock entries. You can see which user is currently holding the lock on the project. If you have the necessary authorizations, you can delete the lock entry, but this should be done with caution and ideally in coordination with the user who is working on the project.
    3. Contact the User: If you know who is working on the project, you can reach out to them to see if they can release the lock.
    4. System Administrator: If the issue persists and you cannot identify the user holding the lock, contact your SAP system administrator for assistance. They can help investigate the issue further and may have tools to release locks if necessary.
    5. Review User Permissions: Ensure that users have the appropriate permissions to access and modify the project. Sometimes, permission issues can lead to unexpected behavior.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as:
      • SM12: To view and manage lock entries.
      • SM21: To check system logs for any related errors or issues.
      • SE11: To check the data dictionary for the project structure.
    • Documentation: Review SAP documentation or help files related to project management and locking mechanisms to understand how locks are managed in your specific SAP environment.
    • User Training: Ensure that users are trained on how to properly exit or save their work to avoid leaving locks on projects unintentionally.

    By following these steps, you should be able to resolve the INM_OF_PROJECT009 error and continue working on the project.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant