Do you have any question about this error?
Message type: E = Error
Message class: IH - structuring
Message number: 001
Message text: Material & cannot be exploded any further
<GL:material>Material</> &V1& cannot be exploded any further, as there
are no objects further down in the structure according to your
initial selection.
INCLUDE 'KEINE-FUNKTION' OBJECT DOKU ID TX LANGUAGE E
Error message extract from SAP system. Copyright SAP SE.
IH001
- Material & cannot be exploded any further ?The SAP error message IH001, which states "Material & cannot be exploded any further," typically occurs in the context of production planning and material requirements planning (MRP) when trying to explode a bill of materials (BOM) for a material that has reached its lowest level of hierarchy or when there are no further components to be exploded.
Causes:
- End of BOM Hierarchy: The material you are trying to explode may be at the end of its BOM hierarchy, meaning it does not have any further components or sub-components.
- Incorrect BOM Configuration: The BOM may not be correctly configured, or it may be missing components that should be included.
- Material Status: The material may have a status that prevents it from being used in production or planning (e.g., blocked, inactive).
- BOM Not Active: The BOM for the material may not be active or may not exist in the system for the specified plant or version.
- Incorrect Planning Parameters: The planning parameters or settings in the MRP run may not be set correctly, leading to issues in the explosion process.
Solutions:
- Check BOM Structure: Verify the BOM structure for the material in question. Use transaction code CS03 to display the BOM and ensure that it is correctly configured and active.
- Review Material Status: Check the material status using transaction code MM03. Ensure that the material is not blocked or inactive.
- Validate BOM Activation: Ensure that the BOM is active for the relevant plant and that it is the correct version. You can check this in the BOM overview.
- Check MRP Settings: Review the MRP settings and parameters to ensure they are correctly configured for the material and that the MRP run has been executed properly.
- Use Alternative Explosion Methods: If the standard explosion does not work, consider using alternative methods or tools within SAP to analyze the BOM and its components.
Related Information:
If the issue persists after checking the above points, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in production planning and BOM management.
Get instant SAP help. Start your 7-day free trial now.
IH000
& & &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
IGRAPH888
Function not yet available
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
IH002
Equipment & does not exist
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
IH003
Equipment & did not exist on &
What causes this issue? The piece of <GL:equipment>equipment</> had not yet been created in the system on the date that you have entered....
Click on this link to search all SAP messages.