Do you have any question about this error?
Message type: E = Error
Message class: IF - Messages re interest accounting in PS/CO/IM
Message number: 016
Message text: Enter a WBS element or network as well
You have entered a network activity without specifying the WBS element
or the network.
No objects selected.
Specify a network or WBS element too.
Example: You have entered network activity "010".
If you specify a network too, the system selects activity 010 for this
network.
If you specify a WBS element too, the system selects the activities 010
from all the networks belonging to this WBS element.
Error message extract from SAP system. Copyright SAP SE.
IF016
- Enter a WBS element or network as well ?The SAP error message IF016 ("Enter a WBS element or network as well") typically occurs in the context of project management and cost planning within SAP. This error indicates that the system requires a Work Breakdown Structure (WBS) element or a network to be specified in the transaction you are trying to execute. Here’s a breakdown of the cause, potential solutions, and related information:
Cause:
- Missing WBS Element or Network: The transaction you are attempting to execute requires a WBS element or a network to be specified, but it has not been provided.
- Incorrect Configuration: The configuration of the project or the transaction may not be set up to allow for the entry of costs or activities without a WBS element or network.
- Transaction Context: Certain transactions in SAP Project System (PS) or Controlling (CO) modules require a WBS element or network to associate costs or activities with a specific project.
Solution:
Enter a WBS Element or Network:
- When prompted with the error, ensure that you enter a valid WBS element or network in the appropriate field. This is typically done in the header or line item of the transaction.
- You can find the WBS element or network by using the search help (F4) to select from existing elements.
Check Project Structure:
- Ensure that the project structure is correctly defined and that the WBS elements or networks you are trying to use are active and correctly configured.
Review Transaction Settings:
- If you are customizing or configuring the transaction, check the settings to ensure that it allows for the entry of WBS elements or networks as required.
Consult Documentation:
- Review the SAP documentation or help files related to the specific transaction you are using to understand the requirements for WBS elements or networks.
User Authorization:
- Ensure that you have the necessary authorizations to access and enter WBS elements or networks in the system.
Related Information:
If the issue persists after trying the above solutions, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in SAP Project System.
Get instant SAP help. Start your 7-day free trial now.
IF015
Interest indicator &1 is not assigned to interest profile &2
What causes this issue? The specified combination of interest indicator &V1& and interest profile &V2& does not exist.System Response...
IF014
An empty interest indicator has the effect of a wild card
What causes this issue? You have not maintained the interest indicator field in the interest relevance determination for value categories.System Resp...
IF017
Line-item interest calc. not possible in summary investment measure
What causes this issue? The line item interest calculation is selected for interest profile &V1&. Summary settlement is selected for capital ...
IF018
No value category exists for commitment item &1
What causes this issue? The system reads payment and cost items for the interest calculation. In addition, it checks the interest relevance of the va...
Click on this link to search all SAP messages.