How To Fix ICC_BTR128 - Reporting date will be last working date of month (&1 instead of &2)


SAP Error Message - Details

  • Message type: E = Error

  • Message class: ICC_BTR - Treasury Localization for Brazil

  • Message number: 128

  • Message text: Reporting date will be last working date of month (&1 instead of &2)

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message ICC_BTR128 - Reporting date will be last working date of month (&1 instead of &2) ?
    The SAP error message ICC_BTR128 indicates that there is an issue with the reporting date in a business transaction. Specifically, it states that the reporting date will be set to the last working day of the month instead of the date you have specified. This typically occurs in the context of financial reporting or month-end closing processes.
    
    Cause: The error is usually triggered by one of the following reasons: Invalid Reporting Date: The date you are trying to use for reporting is not a valid working day or is outside the permissible range for the reporting period. Calendar Settings: The system's calendar settings may not recognize the specified date as a valid working day. Month-End Closing Procedures: The system may enforce rules that require reporting to be done on the last working day of the month for certain transactions.
    Solution: To resolve this error, you can take the following steps: Check the Reporting Date: Ensure that the date

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker