Do you have any question about this error?
Message type: E = Error
Message class: /IBX/PE_RUN_INFO -
Message number: 016
Message text: Start time later than end time
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/IBX/PE_RUN_INFO016
- Start time later than end time ?The SAP error message
/IBX/PE_RUN_INFO016 Start time later than end time
typically indicates that there is a configuration or data entry issue where the start time for a process or event is set to a time that is later than the end time. This can occur in various contexts within SAP, such as scheduling jobs, planning activities, or managing events.Cause:
- Incorrect Time Entry: The most common cause is that the user has mistakenly entered the start time as being later than the end time.
- Data Migration Issues: If data has been migrated from another system, there may be inconsistencies in the time entries.
- Time Zone Differences: If the system is configured to handle multiple time zones, discrepancies may arise if the times are not adjusted accordingly.
- System Configuration: There may be issues with the configuration of the scheduling or planning module that leads to incorrect time calculations.
Solution:
- Check Time Entries: Review the start and end times for the relevant process or event. Ensure that the start time is indeed earlier than the end time.
- Correct Data: If you find that the times are incorrect, update them to reflect the correct values.
- Review Time Zones: If applicable, check the time zone settings to ensure that they are consistent and correctly applied.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidance related to the module you are working with.
- Test Changes: After making corrections, test the process again to ensure that the error does not reoccur.
Related Information:
If the problem persists after following these steps, it may be beneficial to consult with your SAP support team or a technical consultant who can provide more in-depth assistance.
Get instant SAP help. Start your 7-day free trial now.
/IBX/PE_RUN_INFO015
Start date later than end date
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/IBX/PE_RUN_INFO014
You need to enter the date if the time has been entered
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/IBX/PE_RUN_INFO050
Parameter &1 has already been added
What causes this issue? Parameter &V1& has already been added. The parameter service does not support any parameter value changes.System Resp...
/IBX/PE_RUN_INFO051
Parameter &1 is unknown
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.