How To Fix /IBX/PE_PH009 - Process completed: &1 &2


/IBX/PE_PH009 - Overview

  • Message type: E = Error

  • Message class: /IBX/PE_PH -

  • Message number: 009

  • Message text: Process completed: &1 &2

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


/IBX/PE_PH009 - Details

  • The SAP error message /IBX/PE_PH009 Process completed: &1 &2 typically indicates that a process related to the SAP IBP (Integrated Business Planning) has been completed, but it may not have completed successfully or as expected. The placeholders &1 and &2 usually represent specific details about the process, such as the process name and status.
    Possible Causes:
    
    Process 
    Configuration Issues: The process may not be configured correctly in the IBP system. Data Issues: There may be issues with the data being processed, such as missing or incorrect data. System Performance: The system may be experiencing performance issues, leading to incomplete processing. Authorization Issues: The user executing the process may not have the necessary authorizations. Technical Errors: There could be underlying technical errors in the IBP system or related components. Solutions: Check Process Configuration: Review the configuration of the process in the IBP system to ensure it is set up correctly. Review Logs: Check the application logs or error logs for

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


/IBX/PE_PH009 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant