How To Fix IBSSI_CRMTO_MESSAGES046 - IS-U: Point of delivery (IBase &1) has an outline contract ID


IBSSI_CRMTO_MESSAGES046 - Overview

  • Message type: E = Error

  • Message class: IBSSI_CRMTO_MESSAGES - Message Class for Technical Objects

  • Message number: 046

  • Message text: IS-U: Point of delivery (IBase &1) has an outline contract ID

  • Show details Hide details
  • What causes this issue?

    The point of delivery (IBase comp. &V1&) has an outline contract ID. You
    can only allocate IS-U transactions that are not
    <DS:GLOS.6BBEEE058BA2D3118F360060B03CA38C>outline contracts</> to
    points of delivery in the object list that do not have an outline
    contract ID.

    System Response

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.

    How to fix this error?

    Remove the outline contract ID for the point of delivery in the
    <DS:GLOS.22B2EBCB3712D51188020090273D34CB>Interaction Center</> or
    allocate them to another point of delivery that does not have an outline
    contract ID.

    Procedure for System Administrators


    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message IBSSI_CRMTO_MESSAGES046 - IS-U: Point of delivery (IBase &1) has an outline contract ID ?
    The SAP error message IBSSI_CRMTO_MESSAGES046 indicates that there is an issue with a point of delivery (POD) in the IS-U (Utilities) module, specifically related to an outline contract ID associated with the IBase (Installation Base) object. This error typically arises when there is an inconsistency or a configuration issue in the contract management or installation base setup.
    
    Cause: Outline Contract Association: The point of delivery (POD) is linked to an outline contract, which may not be correctly configured or may not meet the necessary criteria for the operation you are trying to perform. Data Inconsistency: There may be inconsistencies in the data related to the POD or the outline contract, such as missing or incorrect entries in the database. Contract Status: The outline contract might be in a status that does not allow for the operation you are attempting (e.g., it could be inactive or blocked).
    Configuration Issues: There may be configuration settings in the

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker