Do you have any question about this error?
Message type: E = Error
Message class: /IBS/RB -
Message number: 151
Message text: Existing planned records must be updated
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/IBS/RB151
- Existing planned records must be updated ?The SAP error message
/IBS/RB151 Existing planned records must be updated
typically occurs in the context of SAP Integrated Business Solutions (IBS) or SAP Advanced Planning and Optimization (APO) when there are discrepancies between the planned records in the system and the data being processed. This error indicates that there are existing planned records that need to be updated before proceeding with the current operation.Cause:
- Data Inconsistency: The planned records in the system may not match the current data or configuration settings, leading to inconsistencies.
- Changes in Master Data: If there have been changes in the master data (like material master, vendor master, etc.) that affect the planning records, the system may require an update.
- Planning Version Issues: The planning version being used may not be aligned with the existing planned records.
- Locked Records: Sometimes, planned records may be locked or in a state that prevents them from being updated.
Solution:
Update Planned Records: You need to update the existing planned records. This can typically be done through the planning transaction or by using specific update functions in the system.
- Navigate to the relevant planning transaction (e.g.,
/IBS/RB
transaction) and look for options to update or refresh the planned records.Check Master Data: Review the master data related to the planned records to ensure that it is accurate and up-to-date. Make any necessary adjustments.
Review Planning Versions: Ensure that you are using the correct planning version. If necessary, switch to the appropriate version that aligns with your planned records.
Unlock Records: If the planned records are locked, you may need to unlock them or resolve any issues that are causing the lock.
Consult Documentation: Refer to the SAP documentation or help files related to the specific module you are working with for more detailed instructions on how to handle this error.
Contact Support: If the issue persists, consider reaching out to your SAP support team or consulting with SAP experts who can provide more tailored assistance based on your specific system configuration.
Related Information:
/IBS/RB
for planning-related activities.By following these steps, you should be able to address the error message and ensure that your planned records are correctly updated in the SAP system.
Get instant SAP help. Start your 7-day free trial now.
/IBS/RB150
**************** Object planned record-specific messages
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/IBS/RB148
Enter a valid interest calculation method
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/IBS/RB152
New planned records for RBD account can be generated
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/IBS/RB153
No work balance for &1 &2 and &3
What causes this issue? No working balance could be constructed for: Valuation method: ,,,,&v1& Flow type group:,,,,&v2& Currency:,,,...
Click on this link to search all SAP messages.