How To Fix /IBS/RB069 - Utilization is higher than open contingent liability


/IBS/RB069 - Overview

  • Message type: E = Error

  • Message class: /IBS/RB -

  • Message number: 069

  • Message text: Utilization is higher than open contingent liability

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


/IBS/RB069 - Details

  • The SAP error message /IBS/RB069 Utilization is higher than open contingent liability typically occurs in the context of SAP's Integrated Business Solutions (IBS) or related modules that deal with contingent liabilities and utilization of resources. This error indicates that the utilization of a resource or a financial commitment exceeds the amount that has been set aside as a contingent liability.
    
    Cause: Exceeding Limits: The primary cause of this error is that the utilization of a resource (like a budget, financial commitment, or liability) has surpassed the amount that has been allocated or approved as a contingent liability. Incorrect Configuration: There may be a misconfiguration in the system settings related to contingent liabilities or budget allocations. Data Entry Errors: Incorrect data entry during the creation of contingent liabilities or during the transaction that is trying to utilize these liabilities can lead to this error. Timing Issues: If the contingent liability was not updated or posted correctly

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


/IBS/RB069 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker