How To Fix IAOM250 - You cannot use costing variant &1 for PS projects


SAP Error Message - Details

  • Message type: E = Error

  • Message class: IAOM - Account Assignment Manager Messages

  • Message number: 250

  • Message text: You cannot use costing variant &1 for PS projects

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message IAOM250 - You cannot use costing variant &1 for PS projects ?

    The SAP error message IAOM250, which states "You cannot use costing variant &1 for PS projects," typically occurs in the context of Project System (PS) when there is an issue with the costing variant configuration. Here’s a breakdown of the cause, potential solutions, and related information:

    Cause:

    1. Costing Variant Configuration: The costing variant specified (denoted by &1) is not configured to be used with Project System (PS) projects. This can happen if the costing variant is set up for other purposes (like controlling or product costing) but not for PS.

    2. Project Type: The project type you are trying to use may not be compatible with the costing variant. Different project types may have different requirements for costing variants.

    3. Missing Authorizations: Sometimes, the user may not have the necessary authorizations to use the specified costing variant.

    Solution:

    1. Check Costing Variant Configuration:

      • Go to the configuration settings for costing variants in SAP (Transaction code: OKKN).
      • Ensure that the costing variant you are trying to use is set up for Project System. You may need to create or modify a costing variant to include PS projects.
    2. Assign Costing Variant to Project Profile:

      • Check the project profile assigned to your project (Transaction code: OPRO).
      • Ensure that the costing variant is assigned to the project profile. If not, you may need to assign a valid costing variant that is compatible with PS.
    3. Review Project Type:

      • Verify the project type you are using and ensure that it is compatible with the costing variant. You may need to change the project type or select a different costing variant.
    4. User Authorizations:

      • Check if the user has the necessary authorizations to use the costing variant. If not, you may need to adjust the user roles or permissions.
    5. Consult Documentation:

      • Review SAP documentation or help resources for specific details on the costing variant and its compatibility with PS projects.

    Related Information:

    • Transaction Codes:

      • OKKN: Costing Variants Configuration
      • OPRO: Project Profile Configuration
      • CJ20N: Project Builder (to check project details)
    • SAP Notes: Check for any relevant SAP Notes that may address specific issues or provide updates related to costing variants and PS projects.

    • SAP Community: Engage with the SAP Community forums for insights from other users who may have encountered similar issues.

    By following these steps, you should be able to resolve the IAOM250 error and successfully use the desired costing variant for your PS projects.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant