Do you have any question about this error?
Message type: E = Error
Message class: IAOM - Account Assignment Manager Messages
Message number: 240
Message text: The selected reference usage does not support Controlling for PS projects
The reference usage 'Copy and create additional account assignment' does
not support the controlling type 'Single-object Controlling for PS
projects'. In the reference usage 'Copy and create additional account
assignment', the controlling type determines the creation of additional
account assignment for settlements.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Assign another reference usage or another controlling type.
Error message extract from SAP system. Copyright SAP SE.
IAOM240
- The selected reference usage does not support Controlling for PS projects ?The SAP error message IAOM240 indicates that the selected reference usage does not support Controlling for Project System (PS) projects. This typically occurs when there is a mismatch in the configuration or settings related to the project and its controlling aspects.
Cause:
- Reference Usage Configuration: The reference usage selected for the project may not be configured to support controlling functionalities. This can happen if the reference usage is set up for a different purpose or if it lacks the necessary settings for controlling.
- Project Type: The project type you are trying to use may not be compatible with controlling functionalities. Certain project types may not allow for cost tracking or controlling.
- Missing Authorizations: Sometimes, the user may not have the necessary authorizations to access controlling features for the selected project.
- System Settings: There may be system-wide settings or parameters that restrict the use of controlling in conjunction with the selected reference usage.
Solution:
- Check Reference Usage: Review the reference usage settings in the system. Ensure that the reference usage you are trying to use is configured to support controlling for PS projects. You may need to consult with your SAP configuration team to verify this.
- Project Type Review: Ensure that the project type you are using is compatible with controlling. If necessary, consider changing the project type to one that supports controlling.
- Authorization Check: Verify that the user has the necessary authorizations to perform controlling functions for the project. If not, the user may need to be granted additional permissions.
- Consult Documentation: Refer to SAP documentation or help resources for specific details on the reference usage and its capabilities regarding controlling.
- System Configuration: If the issue persists, it may be necessary to review the overall system configuration related to project controlling. This may involve checking settings in the Project System (PS) module and the Controlling (CO) module.
Related Information:
CJ20N
(Project Builder) and CJI3
(Project Actual Line Items) to analyze project settings and controlling data.If the problem continues after following these steps, it may be beneficial to reach out to your SAP support team or a consultant with expertise in SAP Project System and Controlling for further assistance.
Get instant SAP help. Start your 7-day free trial now.
IAOM239
Process attribute &1 does not exist in Customizing
What causes this issue? In the definition of the business scenario, a process attribute was defined that is not entered in either of the Customizing ...
IAOM238
Lower-level object &1 is being investigated and modified as necessary
What causes this issue? For the external object &V2&, the reference or the higher-level object was changed. As a consequence, all lower-leve...
IAOM241
There are more recent entries in the acct asst manager for this object
What causes this issue? The account assignment manager is attempting to change something in the administration for an external object. This does not ...
IAOM242
No changes possible to historical object entries in acct asst manager
What causes this issue? It is not possible to change historical entries in administration of the account assignment manager.System Response The syst...
Click on this link to search all SAP messages.