How To Fix I0246 - WBS element &1 was requested by cost center &2


SAP Error Message - Details

  • Message type: E = Error

  • Message class: I0 - Messages for PM tables

  • Message number: 246

  • Message text: WBS element &1 was requested by cost center &2

  • Show details Hide details
  • What causes this issue?

    The WBS element &V1& was required by <DS:GLOS.cost_center>cost
    center</> &V2&.
    However, the current technical object (for example the
    <DS:GLOS.functional_location>functional location</> or
    <DS:GLOS.equipment>equipment</>) belongs to cost center &V3&.

    System Response

    INCLUDE 'VERARBEITUNG-ENTER' OBJECT DOKU ID TX LANGUAGE E

    How to fix this error?

    Check your entries.

    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message I0246 - WBS element &1 was requested by cost center &2 ?

    The SAP error message I0246 indicates that a Work Breakdown Structure (WBS) element was requested by a cost center, but there is an issue with the assignment or configuration. This error typically arises in the context of project management and cost accounting within SAP.

    Cause:

    1. Incorrect Assignment: The WBS element may not be correctly assigned to the specified cost center.
    2. Missing Configuration: The cost center may not be configured to allow the use of the specified WBS element.
    3. Authorization Issues: The user may not have the necessary authorizations to access the WBS element or the cost center.
    4. Inactive WBS Element: The WBS element might be inactive or not available for the specified period.
    5. Data Consistency Issues: There may be inconsistencies in the master data related to the WBS element or cost center.

    Solution:

    1. Check Assignment: Verify that the WBS element is correctly assigned to the cost center in the system. You can do this by checking the configuration in the project system settings.
    2. Review Configuration: Ensure that the cost center is configured to allow the use of the WBS element. This may involve checking the settings in the controlling area.
    3. Authorization Check: Confirm that the user has the necessary authorizations to access both the WBS element and the cost center. This can be done by reviewing the user's roles and authorizations in SAP.
    4. Activate WBS Element: If the WBS element is inactive, you may need to activate it or check its status to ensure it is available for use.
    5. Data Consistency: Run consistency checks on the master data to identify and resolve any discrepancies between the WBS element and the cost center.

    Related Information:

    • Transaction Codes: You may use transaction codes like CJ20N (Project Builder) to check the WBS elements and their assignments, or KS03 (Display Cost Center) to review cost center details.
    • SAP Notes: Check for any relevant SAP Notes that may address specific issues related to this error message.
    • Documentation: Refer to SAP documentation for detailed information on WBS elements, cost centers, and their integration within the project system and controlling modules.

    If the issue persists after checking the above points, it may be beneficial to consult with your SAP support team or refer to SAP community forums for further assistance.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant