Do you have any question about this error?
Message type: E = Error
Message class: I0 - Messages for PM tables
Message number: 243
Message text: WBS element &1 is performed by plant &2
The WBS element &V1& that has been entered is executed from
<DS:GLOS.plant>plant</> &V2&. However, the current technical object
(for example the <DS:GLOS.functional_location>functional location</> or
the <DS:GLOS.equipment>equipment</> is assigned to the
<DS:GLOS.maintenance_planning_plant>maintenance planning plant</> &V3&.
INCLUDE 'VERARBEITUNG-ENTER' OBJECT DOKU ID TX LANGUAGE E
Check your entries.
Error message extract from SAP system. Copyright SAP SE.
I0243
- WBS element &1 is performed by plant &2 ?The SAP error message I0243 indicates that a Work Breakdown Structure (WBS) element is being assigned to a plant that is not authorized to perform the activities associated with that WBS element. This typically occurs in project management and controlling modules when there is a mismatch between the WBS element and the plant's capabilities or assignments.
Cause:
- Plant Assignment: The plant specified in the error message is not assigned to the WBS element in the project structure.
- Authorization Issues: The user may not have the necessary authorizations to perform actions related to the specified WBS element and plant.
- Configuration Issues: There may be configuration settings in the project system that restrict the assignment of certain plants to specific WBS elements.
- Project Structure: The project structure may not be correctly set up to allow the specified plant to perform activities related to the WBS element.
Solution:
Check Plant Assignment:
- Go to the project definition in the Project System (PS) module and verify if the plant is correctly assigned to the WBS element.
- If not, you may need to assign the correct plant to the WBS element.
Review Authorizations:
- Ensure that the user has the necessary authorizations to work with the specified WBS element and plant.
- If needed, consult with your SAP security team to adjust user roles and permissions.
Configuration Review:
- Check the configuration settings in the Project System to ensure that the plant is allowed to perform activities related to the WBS element.
- This may involve reviewing the settings in the IMG (Implementation Guide) under Project System.
Consult Documentation:
- Review SAP documentation or help resources for any specific notes related to this error message.
- Sometimes, SAP Notes may provide additional insights or patches that can resolve the issue.
Contact Support:
- If the issue persists after checking the above points, consider reaching out to your SAP support team or consulting SAP support for further assistance.
Related Information:
CJ20N
(Project Builder) or CJ02
(Change WBS Element) to check and modify the WBS element and its assignments.By following these steps, you should be able to identify the root cause of the error and implement the necessary solutions to resolve it.
Get instant SAP help. Start your 7-day free trial now.
I0242
WBS element &1 belongs to company code &2
What causes this issue? The WBS element &V1& that has been entered belongs to <DS:GLOS.company_code>company code</> &V2&....
I0241
WBS element &1 belongs to business area &2
What causes this issue? The WBS element &V1& that has been entered belongs to <DS:GLOS.business_area>business area</> &V2&...
I0244
WBS element &1 is assigned to functional location &2
What causes this issue? The WBS element &V1& is assigned to the <DS:GLOS.functional_location>functional location</> &V2& ...
I0245
WBS element &1 is assigned to equipment &2
What causes this issue? The WBS element &V1& is assigned to <DS:GLOS.equipment>equipment</> &V2& in its master record. Ho...
Click on this link to search all SAP messages.